Back to bathroom remodel contractors
Pattani Construction Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2006 to Sep 2026
- Last 24 months
- 8 permits filed
77 permits since 2000: 59 completed, 5 in progress, 11 never finaled, 2 expired or cancelled.
Of the 11 never-finaled permits, 3 are 3 to 5 years old, 8 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 19 completed, 2 in progress, 2 never finaled. Typically 1 days from filing to permit and 221 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2026 | Completed final sign-off May 2026 | 26 27th St | replace window in-kind, same opening. remove carpet and install new hardwood floor in 2 bedrooms. change toilet, vanity and (e) shower in bathroom, tile work and painting.Details
replace window in-kind, same opening. remove carpet and install new hardwood floor in 2 bedrooms. change toilet, vanity and (e) shower in bathroom, tile work and painting. | $10,000 |
| Apr 26, 2023 | Completed final sign-off Dec 2025 | 1756 Broadway | convert (e) undocumented ground floor unit to become studio 1 bath adu. reference soft story work under separate permit #202210144345Details
convert (e) undocumented ground floor unit to become studio 1 bath adu. reference soft story work under separate permit #202210144345 | $138,000 |
| Jan 20, 2023 | Completed final sign-off Dec 2025 | 1756 Broadway | detached garage - convert (e) detached garage to become 1-bed, 1-bath adu within (e) structure.Details
detached garage - convert (e) detached garage to become 1-bed, 1-bath adu within (e) structure. | $138,000 |
| Dec 1, 2022 | In progress issued Nov 2025 | 1346 Alabama St | (n) unit b1: legalize unit at floor 04, two bedrooms, one bathroom at block # 4271 lot #46. per ord 43-14.Details
(n) unit b1: legalize unit at floor 04, two bedrooms, one bathroom at block # 4271 lot #46. per ord 43-14. | $81,400 |
| Dec 1, 2022 | In progress issued Nov 2025 | 1346 Alabama St | (n) unit a1: adu at floors 01 & 02, one bedroom, one bath at block #4271 lot #045. per state ord.Details
(n) unit a1: adu at floors 01 & 02, one bedroom, one bath at block #4271 lot #045. per state ord. | $111,260 |
| Jul 7, 2022 | Completed final sign-off Mar 2024 | 1025 Hampshire St | per ordinance 43-14, legalize (1) unit @ 1/f of an existing 2 unit bldg. legalized unit will have (1) bedroom w/kitchen, bath & open denDetails
per ordinance 43-14, legalize (1) unit @ 1/f of an existing 2 unit bldg. legalized unit will have (1) bedroom w/kitchen, bath & open den | $70,000 |
| Sep 29, 2020 | Completed final sign-off Dec 2020 | 3237 17th St | remodel 1 kitchen and 2 bathrooms in-kind. new cabinets, sink, appliances at same location. new toilet, vanites, and painting. no structural workDetails
remodel 1 kitchen and 2 bathrooms in-kind. new cabinets, sink, appliances at same location. new toilet, vanites, and painting. no structural work | $20,000 |
| Aug 9, 2019 | Completed final sign-off Sep 2020 | 122 Sussex St | to comply with complaint 201949681. new family rm & internal stair in basement w/new bedrm/bath 1st flr remodel kitchen & powder rm, convert den to bedrm & bath, 2nd flr - remodel bedrms/bath add 1 bathDetails
to comply with complaint 201949681. new family rm & internal stair in basement w/new bedrm/bath 1st flr remodel kitchen & powder rm, convert den to bedrm & bath, 2nd flr - remodel bedrms/bath add 1 bath | $138,000 |
| Jun 17, 2019 | Never finaled issued Jan 2022, no final | 674 Douglass St | upper unit. kitchen and bath remodel. reconfigure bedrooms, add dormers. replace all existing windows & add 2 windows at the front with aluminum clad wood windows.Details
upper unit. kitchen and bath remodel. reconfigure bedrooms, add dormers. replace all existing windows & add 2 windows at the front with aluminum clad wood windows. | $300,000 |
| Jan 9, 2019 | Completed final sign-off Sep 2020 | 122 Sussex St | repair damaged files in bathroom & wood floor. repair/replace old kitchen cabinets & countertop. repair drywall in laundry & paint. non structural in laundry & paint. non structural work. all work in-kind.Details
repair damaged files in bathroom & wood floor. repair/replace old kitchen cabinets & countertop. repair drywall in laundry & paint. non structural in laundry & paint. non structural work. all work in-kind. | $15,000 |
| Nov 15, 2018 | Completed final sign-off Mar 2019 | 370 Mangels Av | kitchen & bath remodel; add family room , home office & bathroom at ground floor, replace windowsDetails
kitchen & bath remodel; add family room , home office & bathroom at ground floor, replace windows | $100,000 |
| May 4, 2016 | Completed final sign-off Nov 2016 | 52 Homestead St | revision to 201205049828. omit elevator, reconfigure kitchen, baths, closets.reconfigure porch layout & replace guardrail. realign exterior windows and skylightsDetails
revision to 201205049828. omit elevator, reconfigure kitchen, baths, closets.reconfigure porch layout & replace guardrail. realign exterior windows and skylights | $25,000 |
| Jun 2, 2014 | Never finaled issued Jun 2014, no final | 1939 15th St | remodel kitchen with new cabinets , fixtures & new countertops paint unit, sand hardood floors remodel bathroom electrical 20 outlets /receptacles, 12 recessed lights, plumbing- new sin, new toilet, new shower.Details
remodel kitchen with new cabinets , fixtures & new countertops paint unit, sand hardood floors remodel bathroom electrical 20 outlets /receptacles, 12 recessed lights, plumbing- new sin, new toilet, new shower. | $20,000 |
| Aug 13, 2013 | Completed final sign-off Mar 2021 | 3909 Irving St | replace tile in bathroom of unit 1, replace tile in kitchen, paint unit 1, tile inside of front door, install carpet in commom area paint commom area.Details
replace tile in bathroom of unit 1, replace tile in kitchen, paint unit 1, tile inside of front door, install carpet in commom area paint commom area. | $1,800 |
| Mar 2, 2012 | Completed final sign-off Apr 2013 | 3235 17th St | adding a bathroom to existing bedroom at garage level.Details
adding a bathroom to existing bedroom at garage level. | $15,000 |
| Nov 15, 2011 | Completed final sign-off May 2012 | 4524 03rd St | unit a: repair minor fire damage, kitchen ceilings and re-tile bathroom walls, new floor coverings, unit a: no structural work, repair in kindDetails
unit a: repair minor fire damage, kitchen ceilings and re-tile bathroom walls, new floor coverings, unit a: no structural work, repair in kind | $3,500 |
| Aug 9, 2011 | Completed final sign-off Feb 2012 | 28 Hill St | revision to 201002226885. 3rd. floor; add skylights @ bathrooms. 2nd. floor; add window @ lightwell & passage to yard. 1st. floor; relocate washer/dryer, add skylight above hall, add tool closet.Details
revision to 201002226885. 3rd. floor; add skylights @ bathrooms. 2nd. floor; add window @ lightwell & passage to yard. 1st. floor; relocate washer/dryer, add skylight above hall, add tool closet. | $9,000 |
| Feb 22, 2010 | Completed final sign-off Feb 2012 | 28 Hill St | revision to appl #200503258439 & 200804099282: reconfigure kitchen & bath , remove one of two stair, add one bathroom on third floor.Details
revision to appl #200503258439 & 200804099282: reconfigure kitchen & bath , remove one of two stair, add one bathroom on third floor. | $18,000 |
| Aug 4, 2009 | Completed final sign-off Sep 2009 | 1947 15th St | remodel existing kitchen and bath in kind. approx 14 lin ft of countertop. sand hardwood floor per 2007 mech code. replace existing hood in kid to exist vent unit 1947, #1Details
remodel existing kitchen and bath in kind. approx 14 lin ft of countertop. sand hardwood floor per 2007 mech code. replace existing hood in kid to exist vent unit 1947, #1 | $6,500 |
| Jul 23, 2009 | Completed final sign-off Oct 2009 | 148 Peralta Av | remodel existing kitchen 8 linear ft. counter and existing bath add a new bath, add (n) florescent light fixtures as per code. bath fans as required by code.(rear bldg).plumbing & electrical under separate permit.Details
remodel existing kitchen 8 linear ft. counter and existing bath add a new bath, add (n) florescent light fixtures as per code. bath fans as required by code.(rear bldg).plumbing & electrical under separate permit. | $20,000 |
| May 6, 2009 | Completed final sign-off Oct 2009 | 148 Peralta Av | front bldg. unit #a & b- install new bath in both units.Details
front bldg. unit #a & b- install new bath in both units. | $10,000 |
| Feb 23, 2009 | Completed final sign-off Oct 2009 | 148 Peralta Av | to clear complaint# 200986547. repair less than 50% to rear stairs. repair broken windows glass where needed. replace 2 rear windows. 2 patio doors @ rear of building in unit# a & # b. remodel (e) kitchen & baths in unit# a & # b. remove 50% lath & plaster in unit# a & # b. replace with sheetrock.Details
to clear complaint# 200986547. repair less than 50% to rear stairs. repair broken windows glass where needed. replace 2 rear windows. 2 patio doors @ rear of building in unit# a & # b. remodel (e) kitchen & baths in unit# a & # b. remove 50% lath & plaster in unit# a & # b. replace with sheetrock. | $45,000 |
| Oct 22, 2008 | Completed final sign-off Sep 2010 | 3255 Pierce St | residential addition to extg at second and 3rd levels including renovation of kitchen, addtion of one bathroom closets, addition of dining and living rooms. relocation/replacement of extg rear wooden stair. new roof decksDetails
residential addition to extg at second and 3rd levels including renovation of kitchen, addtion of one bathroom closets, addition of dining and living rooms. relocation/replacement of extg rear wooden stair. new roof decks | $70,000 |