Patrick Walters
- Based in
- Novato
- On San Francisco permits
- Jan 2010 to May 2015
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 22 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 7, 2010 | Completed final sign-off Jan 2010 | 250 Corona St | install (n) 6' french door (u-factor 0.32) @ 2nd. story deck. not visible from street, adjacent to hall. install 1-exterior light, relocate 1-exterior light (motion sensor-photo cell controlled). install a 4x12 header to accomodate (n) opening.Details
install (n) 6' french door (u-factor 0.32) @ 2nd. story deck. not visible from street, adjacent to hall. install 1-exterior light, relocate 1-exterior light (motion sensor-photo cell controlled). install a 4x12 header to accomodate (n) opening. | $2,000 |