Patrick Phelan Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Mar 2001
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 19, 2001 | Expired or cancelled expired Sep 2001 | 1379 19th Av | replacing cabinets. some new sheetrock. some extra eletrical outlets. new hardwood floor. non structDetails
replacing cabinets. some new sheetrock. some extra eletrical outlets. new hardwood floor. non struct | $6,000 |
| Feb 12, 2001 | Completed final sign-off May 2001 | 1424 Sanchez St | raise a 10'-12' section(rear) approx of foundation above grade level.(min 6" above grade). max 12" fDetails
raise a 10'-12' section(rear) approx of foundation above grade level.(min 6" above grade). max 12" f | $1,000 |