Back to bathroom remodel contractors
Patrick Keaney Const
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2024
- Last 24 months
- 0 permits filed
43 permits since 2000: 33 completed, 2 never finaled, 8 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 8 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 82 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2021 | Completed final sign-off Apr 2021 | 105 Bartlett St | remodel 1 bathroom. replace tub with shower stall. new vanity, toilet, tile shower and floor. no change layout of walls & opening.Details
remodel 1 bathroom. replace tub with shower stall. new vanity, toilet, tile shower and floor. no change layout of walls & opening. | $10,000 |
| Feb 11, 2021 | Never finaled issued Feb 2021, no final | 120 Graystone Tr | aka 127 crown ct: apts 1-9 remodel each unit kitchen & bathroom in-kind. replace cabinets & fixtures, electrical, wiring & plumbing as needed. no changes to any partition walls. no changes to fire life devices. all work in-kind.Details
aka 127 crown ct: apts 1-9 remodel each unit kitchen & bathroom in-kind. replace cabinets & fixtures, electrical, wiring & plumbing as needed. no changes to any partition walls. no changes to fire life devices. all work in-kind. | $180,000 |
| Aug 7, 2020 | Completed final sign-off Oct 2020 | 2787 California St | unit b: kitchen & bath renovation. new cabinets & finishes in kind at second floor.Details
unit b: kitchen & bath renovation. new cabinets & finishes in kind at second floor. | $22,000 |
| May 31, 2018 | Expired or cancelled expired Jul 2019 | 1276 Geneva Av | remodel 2 bathrooms on 2nd fl to replace total of 6 bathroom fixtures, wall & floor tile in existing bathrooms. no wall moved, removed, added, or infilled. all existing layout to remain unchanged.Details
remodel 2 bathrooms on 2nd fl to replace total of 6 bathroom fixtures, wall & floor tile in existing bathrooms. no wall moved, removed, added, or infilled. all existing layout to remain unchanged. | $12,000 |
| Dec 18, 2009 | Completed final sign-off Feb 2010 | 45 Rosewood Dr | add bathroom on existing walkin closet, become master bedroom @ 2nd floor.Details
add bathroom on existing walkin closet, become master bedroom @ 2nd floor. | $12,000 |
| Jun 12, 2007 | Completed final sign-off Mar 2008 | 118 Beulah St | kitchen remodel, bath remodel, new bath, electrical upgrade.Details
kitchen remodel, bath remodel, new bath, electrical upgrade. | $45,000 |
| Jul 11, 2006 | Expired or cancelled expired Oct 2007 | 398 07th St | proposed modification of esisting bathrooms to comply w/ada reqirement. no change to existing boundry ,all work is voluntaryDetails
proposed modification of esisting bathrooms to comply w/ada reqirement. no change to existing boundry ,all work is voluntary | $35,000 |
| Jul 27, 2005 | Completed final sign-off Aug 2005 | 1472 06th Av | remodel bathroom, tile and paint,flourescent lightingDetails
remodel bathroom, tile and paint,flourescent lighting | $6,000 |
| Mar 30, 2005 | Completed final sign-off Jun 2005 | 1915 15th Av | paint interior & exterior,repair floor (refinish wood floor),plaster walls,new tile in bath,Details
paint interior & exterior,repair floor (refinish wood floor),plaster walls,new tile in bath, | $35,000 |
| May 8, 2002 | Completed final sign-off Sep 2002 | 1021 Cortland Av | interior alteration partial infill of grd level with a bedroom bathroom & walkin closet. new furnaceDetails
interior alteration partial infill of grd level with a bedroom bathroom & walkin closet. new furnace | $35,000 |
| Feb 20, 2001 | Completed final sign-off Mar 2002 | 2462 31st Av | repair deck repair dryrot. relocate plumbing fixtures in existing bathroom.Details
repair deck repair dryrot. relocate plumbing fixtures in existing bathroom. | $3,000 |