Back to bathroom remodel contractors
Patrick K G Co.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Jun 2026
- Last 24 months
- 1 permit filed
24 permits since 2000: 20 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 6 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2026 | In progress filed Jun 2026, not yet issued | 1477 06th Av | 1) remodel sunroom at 2/f. 2) add (n) bedroom & (n) bathroom at rear of 1/f. 3) 1/f garage level interior remodeling & relocate (e) stairs between 1/f & 2/f.Details
1) remodel sunroom at 2/f. 2) add (n) bedroom & (n) bathroom at rear of 1/f. 3) 1/f garage level interior remodeling & relocate (e) stairs between 1/f & 2/f. | $20,000 |
| Dec 1, 2022 | Completed final sign-off Jul 2024 | 129 04th Av | basic remodeling to replace cabinet kitchen and sink. faucet and relocate water heater in basement in kind. change bath tub facuet in bathroom only.Details
basic remodeling to replace cabinet kitchen and sink. faucet and relocate water heater in basement in kind. change bath tub facuet in bathroom only. | $21,000 |
| Sep 14, 2022 | Completed final sign-off Oct 2024 | 131 04th Av | existing bathroom remodelDetails
existing bathroom remodel | $11,000 |
| Jan 24, 2019 | Completed final sign-off Dec 2019 | 353 Crestmont Dr | remodel of three (e) bathrooms, in-kind. layout remains unchanged. no wall modifcations. layout remains unchangedDetails
remodel of three (e) bathrooms, in-kind. layout remains unchanged. no wall modifcations. layout remains unchanged | $45,000 |
| Oct 9, 2018 | Completed final sign-off Apr 2019 | 419 Frederick St | renovate existing bathroom, new toilet & tub in existing location. new sink in new location. new tile floor, new electrical in existing locationsDetails
renovate existing bathroom, new toilet & tub in existing location. new sink in new location. new tile floor, new electrical in existing locations | $15,000 |
| Jun 5, 2017 | Never finaled issued Jun 2017, no final | 417 Frederick St | revision to pa 2017-0210-9223 - revise 1 bathroom and closet. reconfigure bathroom on 2nd and 3rd floor.Details
revision to pa 2017-0210-9223 - revise 1 bathroom and closet. reconfigure bathroom on 2nd and 3rd floor. | |
| Feb 10, 2017 | Expired or cancelled expired Sep 2025 | 417 Frederick St | remodel (e) kitchen and bathroom in kind on both second and third floor unitsDetails
remodel (e) kitchen and bathroom in kind on both second and third floor units | $45,000 |
| Apr 14, 2006 | Completed final sign-off Aug 2006 | 1590 15th Av | work at the downstairs bathroom to repair all dry rot damage including replacing the bathroom fixture and repairing the northeast corner at the property nearby the washer and dryer location in the garage approximately 300 to 400 sqft area. work on grd floor.Details
work at the downstairs bathroom to repair all dry rot damage including replacing the bathroom fixture and repairing the northeast corner at the property nearby the washer and dryer location in the garage approximately 300 to 400 sqft area. work on grd floor. | $8,000 |
| Mar 4, 2002 | Completed final sign-off Mar 2002 | 2636 Mcallister St | replace bathroom tile & install a new toilet & vanity due to water damage. no structural work,Details
replace bathroom tile & install a new toilet & vanity due to water damage. no structural work, | $3,100 |