Patrick J. Connolly
- Based in
- San Francisco
- On San Francisco permits
- Oct 2011 to Aug 2016
- Last 24 months
- 0 permits filed
15 permits since 2000: 11 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 1, 2016 | Never finaled issued Aug 2016, no final | 2132 Great Hy | to remove the wall dividing the entry to the hallway to install insulation and new sheetrock. to run new elect for new light fixture and switches. to raise up the floor in the entry way. to install a new front doorDetails
to remove the wall dividing the entry to the hallway to install insulation and new sheetrock. to run new elect for new light fixture and switches. to raise up the floor in the entry way. to install a new front door | $15,000 |
| Dec 3, 2015 | Completed final sign-off Sep 2017 | 70 Idora Av | to clear nov#201567071. to remove (e) brick steps/repair 2 windows not visible from street. remove some stucco for waterproofing. repair any damaged wood under the steps & to reinstall brick to original. all work less than 50%.Details
to clear nov#201567071. to remove (e) brick steps/repair 2 windows not visible from street. remove some stucco for waterproofing. repair any damaged wood under the steps & to reinstall brick to original. all work less than 50%. | $15,000 |
| Aug 27, 2015 | Completed final sign-off Oct 2015 | 135 Terra Vista Av | remove and replace 12 steps and landing in kind. remove and replace 2 feet of stucco above the steps. repair rotten wood under existing steps less than 50 percent.Details
remove and replace 12 steps and landing in kind. remove and replace 2 feet of stucco above the steps. repair rotten wood under existing steps less than 50 percent. | $16,000 |
| May 20, 2014 | Completed final sign-off Jun 2014 | 541 Staples Av | remove and replace existing brick stairs and waterproofing at the front of the house, less than 50%.Details
remove and replace existing brick stairs and waterproofing at the front of the house, less than 50%. | $10,000 |
| Oct 31, 2013 | Completed final sign-off Dec 2013 | 640 Oak St | add one toilet and two sinks within existing bathroom and half-bathroom. no additional work to be performed. no lighting change.Details
add one toilet and two sinks within existing bathroom and half-bathroom. no additional work to be performed. no lighting change. | $14,000 |
| Jun 18, 2013 | Never finaled issued Jun 2013, no final | 725 Treat Av | revision to pa #2013.06.03.8526 - replacement (e) brick footing of front stair.Details
revision to pa #2013.06.03.8526 - replacement (e) brick footing of front stair. | $3,500 |
| Jun 3, 2013 | Never finaled issued Jun 2013, no final | 725 Treat Av | repair existing front exterior stairDetails
repair existing front exterior stair | $6,000 |
| May 29, 2013 | Completed final sign-off Jul 2013 | 2 Sunview Dr | to remove and replace existing tile front steps and water proofing less than 50%.Details
to remove and replace existing tile front steps and water proofing less than 50%. | $5,000 |
| Apr 26, 2013 | Completed final sign-off Jun 2013 | 2087 17th Av | remodel existing kitchen & bathroom on 2nd floor. repair dry rot roof joists at existing skylight over bathroomDetails
remodel existing kitchen & bathroom on 2nd floor. repair dry rot roof joists at existing skylight over bathroom | $37,000 |
| Apr 10, 2013 | Completed final sign-off May 2013 | 549 Staples Av | remove and repair front steps less 50%Details
remove and repair front steps less 50% | $10,000 |
| Jan 22, 2013 | Completed final sign-off Apr 2013 | 50 Norton St | remodel (e) kitchen and bathroom. to comply with cec 150(k08Details
remodel (e) kitchen and bathroom. to comply with cec 150(k08 | $38,000 |
| May 10, 2012 | Completed final sign-off May 2012 | 70 St Marys Av | refinish (e) bathrm of single family dwelling; repl (e) bath tub with (n) shower; install 3 fluorescent can lightrs & exhaust fa, no change on walls and openingDetails
refinish (e) bathrm of single family dwelling; repl (e) bath tub with (n) shower; install 3 fluorescent can lightrs & exhaust fa, no change on walls and opening | $25,000 |
| Mar 2, 2012 | Completed final sign-off Sep 2013 | 1507 Dolores St | revision to pa# 201011235548. reconfigure living room and hallway at ground floor.Details
revision to pa# 201011235548. reconfigure living room and hallway at ground floor. | $45,000 |
| Jan 25, 2012 | Expired or cancelled expired Jun 2013 | 245 Roosevelt Wy | voluntary strengthening of 1st floor/garageDetails
voluntary strengthening of 1st floor/garage | $2,500 |
| Oct 21, 2011 | Completed final sign-off Jan 2012 | 99 Surrey St | Details
|