Back to bathroom remodel contractors
Patrick Coakley Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2007 to Jul 2024
- Last 24 months
- 0 permits filed
86 permits since 2000: 79 completed, 7 never finaled.
Of the 7 never-finaled permits, 4 are 5 to 10 years old, 3 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
35 bathroom remodel permits: 34 completed, 1 never finaled. Typically 2 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2024 | Completed final sign-off May 2025 | 126 Dorchester Wy | convert undeveloped ground floor storage into habitable space. build new bedroom, bathroom, gym, laundry, powder rm, & storage. remodel rear open area into family room. replace extg int. stairs with nw stairs. install nw furnace & tankless w.h. build nw foundation slab & wall framing as required.Details
convert undeveloped ground floor storage into habitable space. build new bedroom, bathroom, gym, laundry, powder rm, & storage. remodel rear open area into family room. replace extg int. stairs with nw stairs. install nw furnace & tankless w.h. build nw foundation slab & wall framing as required. | $248,000 |
| Jan 24, 2024 | Completed final sign-off Jun 2024 | 1977 16th Av | non-structural interior renovation of (e) bathroom and master closet on 2nd fl. no exterior work to be performed. in kind remodelDetails
non-structural interior renovation of (e) bathroom and master closet on 2nd fl. no exterior work to be performed. in kind remodel | $12,000 |
| Jul 25, 2023 | Completed final sign-off Jan 2024 | 528 Noriega St | remodel 2 bathrooms and replace in kind. replace vanity, toilet, tub, shower, tiles.Details
remodel 2 bathrooms and replace in kind. replace vanity, toilet, tub, shower, tiles. | $65,500 |
| Nov 28, 2022 | Completed final sign-off Apr 2023 | 8 Whitney St | remodel kitchen and bathroom inkind.Details
remodel kitchen and bathroom inkind. | $49,200 |
| Nov 22, 2022 | Completed final sign-off Apr 2023 | 2182 31st Av | one kitchen and one bathroom remodel, remove cabinets, etc and replace in kindDetails
one kitchen and one bathroom remodel, remove cabinets, etc and replace in kind | $42,500 |
| Dec 7, 2021 | Completed final sign-off May 2022 | 454 Waller St | revise pa 202101062181 - revise location of bathroom #2 at 1st fl & structural framing revision. per customer, building not sprinklered.Details
revise pa 202101062181 - revise location of bathroom #2 at 1st fl & structural framing revision. per customer, building not sprinklered. | |
| Nov 1, 2021 | Completed final sign-off Nov 2023 | 1966 36th Av | add a new adu on g/f. build a horizontal addition to the rear of the g/f for the adu. - eliminate the existing interior stairs and remodel the existing bathroom and add a new laundry room at 2/f. eg-02 applied.Details
add a new adu on g/f. build a horizontal addition to the rear of the g/f for the adu. - eliminate the existing interior stairs and remodel the existing bathroom and add a new laundry room at 2/f. eg-02 applied. | $85,000 |
| Oct 12, 2021 | Completed final sign-off Mar 2022 | 11 Miramar Av | remodel one kitchen and one bathroom replace all in kind. no structural.Details
remodel one kitchen and one bathroom replace all in kind. no structural. | $40,300 |
| Oct 12, 2021 | Completed final sign-off Feb 2022 | 1465 Waller St | remodel one kitchen and one bathroom replace all in kind. no structural.Details
remodel one kitchen and one bathroom replace all in kind. no structural. | $39,500 |
| Jun 17, 2021 | Completed final sign-off Jun 2021 | 20 Burnside Av | replacing new toilet & vanity as well as new tile. 1/2 bath remodel.Details
replacing new toilet & vanity as well as new tile. 1/2 bath remodel. | $1,930 |
| Jun 8, 2021 | Completed final sign-off Dec 2021 | 578 26th Av | unit 12: remodel and replace 1 kitchen and 1 bath in kind.Details
unit 12: remodel and replace 1 kitchen and 1 bath in kind. | $46,200 |
| Jun 2, 2021 | Completed final sign-off Mar 2022 | 641 Chenery St | 2nd fl remodel e kitchhen area and replace cabinets, reduce e living rm and create new bedroom. remodel e bath. build new bath. 1st fl no new work.Details
2nd fl remodel e kitchhen area and replace cabinets, reduce e living rm and create new bedroom. remodel e bath. build new bath. 1st fl no new work. | $45,000 |
| Apr 21, 2021 | Completed final sign-off Sep 2021 | 16 Whitney St | remodel a kitchen, remodel a bathroom at 2nd floor. like for like no walls to be move.Details
remodel a kitchen, remodel a bathroom at 2nd floor. like for like no walls to be move. | $49,500 |
| Mar 5, 2021 | Completed final sign-off Aug 2021 | 6124 Fulton St | remodel bathroom & kitchen in units 6124 & 6126. remodel of 230 sf of existing livable spce in the ground floor w/a bathroom. remodel in-kind. no layout changeDetails
remodel bathroom & kitchen in units 6124 & 6126. remodel of 230 sf of existing livable spce in the ground floor w/a bathroom. remodel in-kind. no layout change | $87,780 |
| Dec 9, 2020 | Completed final sign-off Sep 2021 | 1457 10th Av | basmnt-reduce (e) garage to 1-car space; add (n) bedrm w/ closet to (n) condition spc. relocate bath & ldry. move utlty area. replace furnace & wh. repair (e) ext stair at rear. grndflr-remove some int walls. remodel (e) powdr rm, kitch. replace 3 windows at rear. 2ndflr-convert mast bed to 2 bedrmDetails
basmnt-reduce (e) garage to 1-car space; add (n) bedrm w/ closet to (n) condition spc. relocate bath & ldry. move utlty area. replace furnace & wh. repair (e) ext stair at rear. grndflr-remove some int walls. remodel (e) powdr rm, kitch. replace 3 windows at rear. 2ndflr-convert mast bed to 2 bedrm | $280,000 |
| Nov 30, 2020 | Completed final sign-off Jul 2021 | 528 Noriega St | remodel (e) master bedroom suite; englard and remodel master bathroom; build new master walk-in closet.Details
remodel (e) master bedroom suite; englard and remodel master bathroom; build new master walk-in closet. | $35,000 |
| Nov 30, 2020 | Completed final sign-off May 2021 | 154 Park St | convert (e) one bedroom one bathroom ground floor unit into a two bedroom two bath dwelling unit. convert (e) living room into a master bedroom. convert (e) dining room into master bathroom. convert (e) bathroom into a bedroom. convert (e) bedroom into open living/dining/kitchen areaDetails
convert (e) one bedroom one bathroom ground floor unit into a two bedroom two bath dwelling unit. convert (e) living room into a master bedroom. convert (e) dining room into master bathroom. convert (e) bathroom into a bedroom. convert (e) bedroom into open living/dining/kitchen area | $85,000 |
| Nov 5, 2019 | Completed final sign-off Jun 2020 | 440 Urbano Dr | lower level improvements: legalize (e) media room, reduce (e) garage/laundry area into (n) conditioned area and convert into (n) bedroom and family room, add new bathroom and new powder room, relocate laundry, add new windows & door at new bedroom, family room and laundry roomDetails
lower level improvements: legalize (e) media room, reduce (e) garage/laundry area into (n) conditioned area and convert into (n) bedroom and family room, add new bathroom and new powder room, relocate laundry, add new windows & door at new bedroom, family room and laundry room | $45,000 |
| Oct 22, 2019 | Completed final sign-off Feb 2021 | 12 Whitney St | unit #12 remodel:replace (e) foundations & new slab to convert (e) unconditioned space into habitable @ 1st fl& convert (e) 2nd fl unit withnew stair;add 2 bedrooms & 2 bathrooms & laundry hook ups @ 1st fl; widen & 1 hr rate (e) passage.(n) fau & tankless water hetaer; 2nd fl - remodel kitchen.Details
unit #12 remodel:replace (e) foundations & new slab to convert (e) unconditioned space into habitable @ 1st fl& convert (e) 2nd fl unit withnew stair;add 2 bedrooms & 2 bathrooms & laundry hook ups @ 1st fl; widen & 1 hr rate (e) passage.(n) fau & tankless water hetaer; 2nd fl - remodel kitchen. | $500,000 |
| Aug 22, 2019 | Completed final sign-off Nov 2019 | 825 Silliman St | relocate new bathroom. reduce garage/storage into habitable space. create new office/study. replace furnace and water heater. replace two rear bedrooms windows at 2nd fl.Details
relocate new bathroom. reduce garage/storage into habitable space. create new office/study. replace furnace and water heater. replace two rear bedrooms windows at 2nd fl. | $30,000 |
| Jul 10, 2019 | Completed final sign-off Oct 2019 | 641 08th Av | demo (e) kitchen, remodel kitchen, demo 1 bathroom, remodel 1 bathroom. kitchen 110 sq ft, bathroom 65 sq ftDetails
demo (e) kitchen, remodel kitchen, demo 1 bathroom, remodel 1 bathroom. kitchen 110 sq ft, bathroom 65 sq ft | $42,000 |
| Jun 7, 2019 | Completed final sign-off Nov 2019 | 825 Silliman St | remodel bottom of stairs; change direction of turn. convert e bedrm into family/e family rm into bedrm2. convert playrm into office/study. replace e kitchen cabinets, appliances & plumbing fixtures. convert e bath & closet into master bath & master closet. remodel bathrm. add wall closet @bedrm2.Details
remodel bottom of stairs; change direction of turn. convert e bedrm into family/e family rm into bedrm2. convert playrm into office/study. replace e kitchen cabinets, appliances & plumbing fixtures. convert e bath & closet into master bath & master closet. remodel bathrm. add wall closet @bedrm2. | $58,000 |
| Apr 30, 2019 | Never finaled filed Apr 2019, never issued | 2270 29th Av | construct (n) 3rd fl level above (e) 2-story bldg. build extension to rear of (3) ground fl & 2nd fl levels. convert rear of ground fl into 2-bedrm/1-bath accessory dwelling unit. extend (e) 1-car garage into 2-car garage & 2-bicyle spaces. remodel (e) 2nd flDetails
construct (n) 3rd fl level above (e) 2-story bldg. build extension to rear of (3) ground fl & 2nd fl levels. convert rear of ground fl into 2-bedrm/1-bath accessory dwelling unit. extend (e) 1-car garage into 2-car garage & 2-bicyle spaces. remodel (e) 2nd fl | $310,000 |
| Apr 5, 2019 | Completed final sign-off Sep 2019 | 2086 23rd Av | remodel the kitchen, remove and replace kitchen cabinets and counters. remodel 2 existing bathrooms on main level. no changes on walls.Details
remodel the kitchen, remove and replace kitchen cabinets and counters. remodel 2 existing bathrooms on main level. no changes on walls. | $68,500 |
| Nov 21, 2014 | Completed final sign-off Apr 2016 | 2270 29th Av | add full bathroom, bedroom and home office at 1st floor. remodel stair 1st to 2nd floor. replace gyp bd. upgrade mech, electrical plumbing on seperate permit. all work interior. not visible from street.Details
add full bathroom, bedroom and home office at 1st floor. remodel stair 1st to 2nd floor. replace gyp bd. upgrade mech, electrical plumbing on seperate permit. all work interior. not visible from street. | $75,000 |
| Oct 28, 2014 | Completed final sign-off Apr 2015 | 124 Inverness Dr | remodel 1 kitchen, remodel 2 bathrooms, take existing lath and plaster off bedrooms and sheetrock after electrical is done.Details
remodel 1 kitchen, remodel 2 bathrooms, take existing lath and plaster off bedrooms and sheetrock after electrical is done. | $112,750 |
| Mar 27, 2014 | Completed final sign-off Jul 2014 | 2055 18th Av | ref pa# 201308134140. on the ground level remodel existing bathroom on the upper floor. remodel kitchen and one bathroom. no change in layout & openings. bathroom lighting shall be high efficacy or controlled by manuel on sensor. kitchen lighting min 50% wattage high efficacy.Details
ref pa# 201308134140. on the ground level remodel existing bathroom on the upper floor. remodel kitchen and one bathroom. no change in layout & openings. bathroom lighting shall be high efficacy or controlled by manuel on sensor. kitchen lighting min 50% wattage high efficacy. | $38,000 |
| Feb 5, 2014 | Completed final sign-off May 2014 | 2967 23rd Av | comply w/compliant #201449331 - addition of new family room & bathroom on lower level.Details
comply w/compliant #201449331 - addition of new family room & bathroom on lower level. | $40,000 |
| Jul 15, 2013 | Completed final sign-off Oct 2015 | 44 Avila St | add 3rd stories (mas. bed room, family rm) renovate kitchen, add stair to grade level, family rm bath at grade level. entire building to be sprinklered nffa13r.Details
add 3rd stories (mas. bed room, family rm) renovate kitchen, add stair to grade level, family rm bath at grade level. entire building to be sprinklered nffa13r. | $200,000 |
| Jun 7, 2013 | Completed final sign-off Oct 2013 | 2135 Greenwich St | interior renovation on 3 floors-add washer & dryer, utility sink. configure bathroom on 3rd floor, eliminate 2 sinks, 1 toilet. no structural work. no change to exterior envelope, no alterations to 2nd floor. no change to (e).Details
interior renovation on 3 floors-add washer & dryer, utility sink. configure bathroom on 3rd floor, eliminate 2 sinks, 1 toilet. no structural work. no change to exterior envelope, no alterations to 2nd floor. no change to (e). | $125,000 |
| Jun 15, 2011 | Completed final sign-off Jun 2012 | 2 Ashbury Tr | interior remodel of existing single family dwelling. install new wood clad windows, restucco exterior. new basement storage and mech rooms with new retaining walls. foundation repaired or replaced as required. new skylights, 3 new baths, (1 at basement)Details
interior remodel of existing single family dwelling. install new wood clad windows, restucco exterior. new basement storage and mech rooms with new retaining walls. foundation repaired or replaced as required. new skylights, 3 new baths, (1 at basement) | $450,000 |
| Nov 10, 2009 | Completed final sign-off Mar 2010 | 1748 Filbert St | partial remodel of 2 kitchens and 2 bathrooms. dry rot, on exterior stairs less than 50%. no move or add walls. kitchen min 50% watt be he. bath h.e. lights or o.s. (manual on).Details
partial remodel of 2 kitchens and 2 bathrooms. dry rot, on exterior stairs less than 50%. no move or add walls. kitchen min 50% watt be he. bath h.e. lights or o.s. (manual on). | $31,500 |
| Mar 10, 2009 | Completed final sign-off May 2009 | 521 Dewey Bl | remodel 2 existing bathrooms ground floor and second floor and 2 new shower pans.Details
remodel 2 existing bathrooms ground floor and second floor and 2 new shower pans. | $23,500 |
| Dec 3, 2007 | Completed final sign-off Mar 2011 | 858 34th Av | alteration & 3rd floor addition including 3 bedrooms, 2 bathrooms & laundry.Details
alteration & 3rd floor addition including 3 bedrooms, 2 bathrooms & laundry. | $100,000 |
| Apr 2, 2007 | Completed final sign-off Aug 2007 | 2435 25th Av | kitchen and bath remodel, existing, no change to partitions. replace 7 windows, not visible from the street, same size and locationDetails
kitchen and bath remodel, existing, no change to partitions. replace 7 windows, not visible from the street, same size and location | $25,500 |