Back to bathroom remodel contractors
Pascual Diaz Construction
- Based in
- Haward
- On San Francisco permits
- Feb 2014 to Oct 2016
- Last 24 months
- 0 permits filed
17 permits since 2000: 13 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 17 days from filing to permit and 296 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2016 | Completed final sign-off Jul 2017 | 30 Edith St | kitchen remodel and electrical upgrade and bath remodelDetails
kitchen remodel and electrical upgrade and bath remodel | $15,000 |
| Apr 12, 2016 | Completed final sign-off Oct 2016 | 10 Normandie Tr | 2nd flr: interior remodel - remove (e) non-bearing wall to enlarge office & kitchen. 3rd flr: interior remodel - remove non-bearing wall to enlarge (e) bedroom & reconfigure (e) bathroomDetails
2nd flr: interior remodel - remove (e) non-bearing wall to enlarge office & kitchen. 3rd flr: interior remodel - remove non-bearing wall to enlarge (e) bedroom & reconfigure (e) bathroom | $50,000 |
| Dec 21, 2015 | Completed final sign-off Jul 2020 | 2444 Van Ness Av | unit #6 interior remodel including new bedroom, bath, new skylight, reconfiguration of space. common area work associated with 2015-1221-5650. maher ordinanceDetails
unit #6 interior remodel including new bedroom, bath, new skylight, reconfiguration of space. common area work associated with 2015-1221-5650. maher ordinance | $100,000 |
| Dec 21, 2015 | Completed final sign-off Jul 2020 | 2444 Van Ness Av | unit #5 interior remodel including new bedroom , bath, infill of blind lightwell, new skylight, & reconfiguration of space. common area work associated with pa 2015-1221-5650Details
unit #5 interior remodel including new bedroom , bath, infill of blind lightwell, new skylight, & reconfiguration of space. common area work associated with pa 2015-1221-5650 | $100,000 |
| Dec 21, 2015 | Completed final sign-off Jul 2020 | 2444 Van Ness Av | unit #4 interior remodel inlcuding additoin of new bedroom, bath & reconfiguration of space. remodel of common areas - remodel of roof deck, fire date, common area & new elevator associate with pa 2015-1221-5645, 2015-1221-5646Details
unit #4 interior remodel inlcuding additoin of new bedroom, bath & reconfiguration of space. remodel of common areas - remodel of roof deck, fire date, common area & new elevator associate with pa 2015-1221-5645, 2015-1221-5646 | $100,000 |
| Aug 17, 2015 | Completed final sign-off Jun 2016 | 1616 Pacific Av | comply with nov 201557281/ 201551684 - bathroom,kitchen remodel. no plans. seismic strap on water heater, pressure relief bring to exterior installation of washer & dryerDetails
comply with nov 201557281/ 201551684 - bathroom,kitchen remodel. no plans. seismic strap on water heater, pressure relief bring to exterior installation of washer & dryer | $20,000 |
| Feb 18, 2014 | Completed final sign-off Aug 2014 | 517 Nevada St | replace front window with fiberglass casements and fixed. remodel kitchen and e bath. make new bathroom at gr fl and closet in bedroom. new door way to existing bedroom. new sidewalk and drivewayDetails
replace front window with fiberglass casements and fixed. remodel kitchen and e bath. make new bathroom at gr fl and closet in bedroom. new door way to existing bedroom. new sidewalk and driveway | $35,000 |