Back to bathroom remodel contractors
Partee Construction Co
- Based in
- Burlingame
- On San Francisco permits
- Jun 2000 to Nov 2021
- Last 24 months
- 0 permits filed
89 permits since 2000: 78 completed, 7 never finaled, 4 expired or cancelled.
Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 30 completed, 1 never finaled. Typically 2 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2021 | Completed final sign-off Mar 2022 | 264 20th Av | 1 kitchen remodel: kitchen cabinets and counter top, install hood fan, install dryer vent. 1 bathroom remodel: bath vanity, bath tub, faucets, bath tile, install bathroom fan. non structural.Details
1 kitchen remodel: kitchen cabinets and counter top, install hood fan, install dryer vent. 1 bathroom remodel: bath vanity, bath tub, faucets, bath tile, install bathroom fan. non structural. | $5,000 |
| Dec 6, 2019 | Completed final sign-off Jul 2020 | 1666 Golden Gate Av | to comply w/nov #201966581 fire damage repair. interior fire rebuild (replace all affected surfaces). minor non-structural wall alterations to reconfigure closets, provide 2 full baths, and remodel kitchen.Details
to comply w/nov #201966581 fire damage repair. interior fire rebuild (replace all affected surfaces). minor non-structural wall alterations to reconfigure closets, provide 2 full baths, and remodel kitchen. | $300,000 |
| May 30, 2019 | Completed final sign-off Dec 2019 | 464 Bartlett St | to comply w/nov 201952371. fire damage - roof rafters, damaged roof sheathing, kitchen, bath in one unit. new roof, paint and trim. replace in kind, no changes.Details
to comply w/nov 201952371. fire damage - roof rafters, damaged roof sheathing, kitchen, bath in one unit. new roof, paint and trim. replace in kind, no changes. | $75,000 |
| Mar 18, 2019 | Completed final sign-off Dec 2019 | 48 Miraloma Dr | remodel and repair due to significant fire damage. remodel (e) kitchen and bathrooms. repair fire damage and roof framing. no work at basementDetails
remodel and repair due to significant fire damage. remodel (e) kitchen and bathrooms. repair fire damage and roof framing. no work at basement | $160,000 |
| Mar 1, 2019 | Completed final sign-off Oct 2019 | 4426 19th St | to comply with nov 2019326911. fire repair. replace damaged plaster and sheetrock, damaged walls and ceilings, electrical, plumbing, sheet metal, two bathrooms, kitchen, tear windows.Details
to comply with nov 2019326911. fire repair. replace damaged plaster and sheetrock, damaged walls and ceilings, electrical, plumbing, sheet metal, two bathrooms, kitchen, tear windows. | $150,000 |
| Nov 30, 2017 | Completed final sign-off May 2018 | 327 05th Av | revision to pa #201708033791 - reduction in scope of work as follows: remodel (interior) two exisitng units including 2 full baths (unit #327) & 1 full & half bath (unit #329). replace/repair finishes throughout. remove (e) fireplace each unit & replace (e) kitchens in-kind.Details
revision to pa #201708033791 - reduction in scope of work as follows: remodel (interior) two exisitng units including 2 full baths (unit #327) & 1 full & half bath (unit #329). replace/repair finishes throughout. remove (e) fireplace each unit & replace (e) kitchens in-kind. | |
| Oct 20, 2017 | Completed final sign-off May 2018 | 1686 Oakdale Av | remodel kitchen, 3 bathrooms, 1 laundry room, repair interior plaster walls, hardwood floors, paint. repair flue pipe to comply nov#201576203Details
remodel kitchen, 3 bathrooms, 1 laundry room, repair interior plaster walls, hardwood floors, paint. repair flue pipe to comply nov#201576203 | $70,000 |
| Oct 11, 2017 | Completed final sign-off Feb 2018 | 1460 48th Av | remodel existing bath and kitchen in upper unit 1460 48th ave. sheetrock, electrical & plumbing. no structural work.Details
remodel existing bath and kitchen in upper unit 1460 48th ave. sheetrock, electrical & plumbing. no structural work. | $40,000 |
| Aug 3, 2017 | Completed final sign-off May 2018 | 327 05th Av | demo (e) unpermitted addition at garage. remodel and reconfigure two existing units to create 3 bedroom, 3.5 baths in each unit and relocating kitchens. no new parkingDetails
demo (e) unpermitted addition at garage. remodel and reconfigure two existing units to create 3 bedroom, 3.5 baths in each unit and relocating kitchens. no new parking | $200,000 |
| Dec 13, 2016 | Completed final sign-off May 2017 | 1132 Hampshire St | relocate extg bedroom and kitchen in both units and open kitchen area to extg living room. fire remediation, including framing repair/replacement, finish repair/replacement, kitchen fixtures and work in bathroom area is under seperate permit.Details
relocate extg bedroom and kitchen in both units and open kitchen area to extg living room. fire remediation, including framing repair/replacement, finish repair/replacement, kitchen fixtures and work in bathroom area is under seperate permit. | $15,000 |
| Nov 8, 2016 | Completed final sign-off May 2017 | 1132 Hampshire St | to comply w/nov 201577882 & 201582721 - fire repair, epair roof rufters, 11 ceiling joist, 15 wall studs, 2 kitchens, 2 bathrooms, sheetrock, siding, roof.Details
to comply w/nov 201577882 & 201582721 - fire repair, epair roof rufters, 11 ceiling joist, 15 wall studs, 2 kitchens, 2 bathrooms, sheetrock, siding, roof. | $160,000 |
| Aug 22, 2016 | Completed final sign-off Jan 2017 | 1101 Gilman Av | fire repair, replace damaged floor joist, wall studs, 200 sq. ft. siding left elevation, plubming, electrical, itchen cabinets, tile baths, & fixtures. no plans required per correct notice.Details
fire repair, replace damaged floor joist, wall studs, 200 sq. ft. siding left elevation, plubming, electrical, itchen cabinets, tile baths, & fixtures. no plans required per correct notice. | $80,000 |
| Nov 25, 2014 | Completed final sign-off May 2015 | 247 Otsego Av | fire damage repair/remodel, repair fire damaged roof, remodel stair 2nd and 3rd flr, install 3rd floor dormer * bathroom, repair elec mech & plmbg system under separate permit. install sprinkler system - under separate permit.Details
fire damage repair/remodel, repair fire damaged roof, remodel stair 2nd and 3rd flr, install 3rd floor dormer * bathroom, repair elec mech & plmbg system under separate permit. install sprinkler system - under separate permit. | $85,000 |
| Jul 22, 2013 | Completed final sign-off Oct 2013 | 161 Boutwell St | revision to 201302019348. legalize 1st floor 1/2 bathroom. electical and plumbing under seperate permit. to comply with #201390081Details
revision to 201302019348. legalize 1st floor 1/2 bathroom. electical and plumbing under seperate permit. to comply with #201390081 | $10,000 |
| Feb 1, 2013 | Completed final sign-off Oct 2013 | 161 Boutwell St | to comply iwth correction notice 2/1/13 fire damage repair, repair 25ftx12ft rear roof area framing in like kindreplace kitkchen and bathroom fixture s. replace damaged sheet rock repair electrical & plumbing 9seperate penalty all work interior hot visible from st; no change wallsDetails
to comply iwth correction notice 2/1/13 fire damage repair, repair 25ftx12ft rear roof area framing in like kindreplace kitkchen and bathroom fixture s. replace damaged sheet rock repair electrical & plumbing 9seperate penalty all work interior hot visible from st; no change walls | $120,000 |
| Jan 14, 2013 | Never finaled issued Jan 2013, no final | 1084 Noe St | revision to 201301107668. remodel 2nd fl kitchen. remodel 3rd fl kitchen. add bath and furnace. plumbing, mech, and elec under separate permit.Details
revision to 201301107668. remodel 2nd fl kitchen. remodel 3rd fl kitchen. add bath and furnace. plumbing, mech, and elec under separate permit. | $20,000 |
| Jan 10, 2013 | Completed final sign-off Oct 2013 | 1084 Noe St | fire damage repairs in kind, repair part of 3rd floor ceiling framing, replace kitchen fixtures, bathroom fixtures, gyp board on walls & ceiling. install insulation, repair electrical & heating system. m.e.p under seperate permits no exterior door and no window work on this permit.Details
fire damage repairs in kind, repair part of 3rd floor ceiling framing, replace kitchen fixtures, bathroom fixtures, gyp board on walls & ceiling. install insulation, repair electrical & heating system. m.e.p under seperate permits no exterior door and no window work on this permit. | $130,000 |
| May 24, 2012 | Completed final sign-off Jan 2013 | 1109 Elm St | fire damage repairs-repl in kind damage roof rafter, ceiling & floor joists, wall studs, siding, 3 kitchens & bathrooms. damage plumbing, electrical, 3 new forced air heaters & water heaters, composition roof, sheetorck, paint. repl 5 windows & 3 doorsDetails
fire damage repairs-repl in kind damage roof rafter, ceiling & floor joists, wall studs, siding, 3 kitchens & bathrooms. damage plumbing, electrical, 3 new forced air heaters & water heaters, composition roof, sheetorck, paint. repl 5 windows & 3 doors | $350,000 |
| Apr 18, 2012 | Completed final sign-off Oct 2012 | 691 42nd Av | to comply with nov 201285253. fire damage repair in like kind. replace 25 ft x 40 ft of roof sheathing and framing. replace 25 ftx20 ft 3rd floor sheathing. replace bathroom and kitchen fixtures in 2 units. repair left side property line wall 3rd floor to roof. replace wall & ceiling gyp board.Details
to comply with nov 201285253. fire damage repair in like kind. replace 25 ft x 40 ft of roof sheathing and framing. replace 25 ftx20 ft 3rd floor sheathing. replace bathroom and kitchen fixtures in 2 units. repair left side property line wall 3rd floor to roof. replace wall & ceiling gyp board. | $200,000 |
| May 20, 2011 | Completed final sign-off Oct 2011 | 35 Caine Av | fire damage replace kitchen and bath elec, plumbing, sheetrock, flooring (no structural work, no layout changes)Details
fire damage replace kitchen and bath elec, plumbing, sheetrock, flooring (no structural work, no layout changes) | $85,000 |
| Jul 14, 2010 | Completed final sign-off Oct 2010 | 415 Belvedere St | fire damage repair in like kind. repair rear stair, replace 6 side windows & 3 rear windows, kitchen/bath fixtures in lower unit. replace gyp.bd. replace kitchen fixtures upper unit, repair gyp. bd. repair electrical & mechanical system (seperate permit). no plan per correct notice of inspectorDetails
fire damage repair in like kind. repair rear stair, replace 6 side windows & 3 rear windows, kitchen/bath fixtures in lower unit. replace gyp.bd. replace kitchen fixtures upper unit, repair gyp. bd. repair electrical & mechanical system (seperate permit). no plan per correct notice of inspector | $70,000 |
| Jun 1, 2010 | Completed final sign-off Aug 2010 | 324 Holloway Av | work on unit #324. fire repair damage-replace sheetrock in bathroom, kitchen. electrical & plumbing. repair rear stairs, less than 50%. remove sheetrock in 2 bedrooms.Details
work on unit #324. fire repair damage-replace sheetrock in bathroom, kitchen. electrical & plumbing. repair rear stairs, less than 50%. remove sheetrock in 2 bedrooms. | $70,000 |
| Sep 18, 2009 | Completed final sign-off Mar 2010 | 1469 Palou Av | fire damage.remove 2 kitchen & 2 bathrooms @ 1st floor.replace roof 24 ftx 50 ft,1 rear window and 8 ft 24 ft siding of rear wall,replace deck, railing,rear landing.new bathroom @ 1st fl.new stair 1st to 2nd flrs.replace gyp walls & ceiling.repair mech system,new insulation to comply with 200118516.Details
fire damage.remove 2 kitchen & 2 bathrooms @ 1st floor.replace roof 24 ftx 50 ft,1 rear window and 8 ft 24 ft siding of rear wall,replace deck, railing,rear landing.new bathroom @ 1st fl.new stair 1st to 2nd flrs.replace gyp walls & ceiling.repair mech system,new insulation to comply with 200118516. | $200,000 |
| Aug 18, 2009 | Completed final sign-off Mar 2010 | 164 Boutwell St | fire repair work - replace damaged blind wall siding, damage roofing, plumbing in bathroom, electrical, sheetmetal work gyp bd @ 1st & 2nd floors. replace 4 front windows, 5 rear windows, install insulation.Details
fire repair work - replace damaged blind wall siding, damage roofing, plumbing in bathroom, electrical, sheetmetal work gyp bd @ 1st & 2nd floors. replace 4 front windows, 5 rear windows, install insulation. | $95,000 |
| Dec 19, 2008 | Completed final sign-off Sep 2009 | 1451 12th Av | fire repair. replace 4 - 2 x 8 roof rafters patch roof sheathing. damage electrical & plumbing, exterior rear plywood insiding, new roofing, new rear window, kitchen & bath. windows replacement not visible from street.Details
fire repair. replace 4 - 2 x 8 roof rafters patch roof sheathing. damage electrical & plumbing, exterior rear plywood insiding, new roofing, new rear window, kitchen & bath. windows replacement not visible from street. | $125,000 |
| Feb 15, 2008 | Completed final sign-off Aug 2008 | 673 Chenery St | work on unit#1,#2 . fire damage repair, replace 1 unit 1 kitchen, 1 bathroom, electrical sheetrock, patch damage roof sheating . replace 4 windows replace in like kind.Details
work on unit#1,#2 . fire damage repair, replace 1 unit 1 kitchen, 1 bathroom, electrical sheetrock, patch damage roof sheating . replace 4 windows replace in like kind. | $85,000 |
| Nov 17, 2005 | Completed final sign-off May 2006 | 352 Park St | add half bath & closet, fire place move wall opening. relocation bedrm & dining rm.Details
add half bath & closet, fire place move wall opening. relocation bedrm & dining rm. | $8,000 |
| Nov 18, 2002 | Completed final sign-off Aug 2003 | 2451 31st Av | fire repair: wall framing, floor joists, 2 bathrooms, kitchen & sheetrockDetails
fire repair: wall framing, floor joists, 2 bathrooms, kitchen & sheetrock | $147,000 |
| Oct 15, 2002 | Completed final sign-off Aug 2003 | 346 04th Av | fire repair: partial roof structure, blind wall floor joists. sub floor, 2 baths, 2 kitchens s/r thrDetails
fire repair: partial roof structure, blind wall floor joists. sub floor, 2 baths, 2 kitchens s/r thr | $325,000 |
| Sep 6, 2001 | Completed final sign-off Nov 2002 | 1611 Broderick St | fire repair replace damaged rafters floor joists blind wall replace kitchen 2 bathrooms s/r,trimDetails
fire repair replace damaged rafters floor joists blind wall replace kitchen 2 bathrooms s/r,trim | $300,000 |
| Dec 1, 2000 | Completed final sign-off Mar 2001 | 3234 Jennings St | fire repair 7 l.f. exterior wall framing 150 sq. f. siding dry wall new bath fixturesDetails
fire repair 7 l.f. exterior wall framing 150 sq. f. siding dry wall new bath fixtures | $58,000 |