Back to bathroom remodel contractors
Parodi Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2005 to Oct 2021
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 178 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2021 | Completed final sign-off Mar 2022 | 914 Ashbury St | repair old piping in bathroom take out tile to get 3 lights,3 plugs, one fan, new drain pipe for shower and tub move shower headsDetails
repair old piping in bathroom take out tile to get 3 lights,3 plugs, one fan, new drain pipe for shower and tub move shower heads | $16,000 |
| Jul 1, 2014 | Completed final sign-off Jan 2015 | 916 Ashbury St | replace (e) tile, bath tub and toilet & sink. bathroom size 6'x9'Details
replace (e) tile, bath tub and toilet & sink. bathroom size 6'x9' | $900 |