Back to bathroom remodel contractors
Paradise Development
- Based in
- Boulder Creek
- On San Francisco permits
- Apr 2005 to Feb 2008
- Last 24 months
- 0 permits filed
5 permits since 2000: 2 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 expired or cancelled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2006 | Expired or cancelled expired Dec 2007 | 321 Peru Av | repair damaged 2x4s and ceiling joists (about 100 to 200 sf) from fire damage. replace plumbing and electrical . install new drywall as needed replace kitchen & bathroom cabinets paint and flooring reroof. structural work consists of replacing in kind certain studs and ceiling joists.Details
repair damaged 2x4s and ceiling joists (about 100 to 200 sf) from fire damage. replace plumbing and electrical . install new drywall as needed replace kitchen & bathroom cabinets paint and flooring reroof. structural work consists of replacing in kind certain studs and ceiling joists. | $32,000 |