Back to bathroom remodel contractors
Pantheon Design And Construction
- Based in
- San Pablo
- On San Francisco permits
- Dec 2014 to May 2020
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 23 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2020 | Completed final sign-off Sep 2020 | 137 03rd Av | 2nd floor: remodel two bathrooms. partial kitchen remodel. refinish hardwood floors. all work in-kind.Details
2nd floor: remodel two bathrooms. partial kitchen remodel. refinish hardwood floors. all work in-kind. | $45,000 |
| Jan 14, 2020 | Never finaled issued Jan 2020, no final | 601 Van Ness Av | #952: remodel kitchen, remodel bathroom & add can lights.Details
#952: remodel kitchen, remodel bathroom & add can lights. | $13,000 |
| Oct 19, 2015 | Completed final sign-off Jul 2016 | 50 Northwood Dr | remodel basement, add 1 bathroom, 1 laundry room. remodel & add 1 half bathroom on main floor. replace basement windows (7), no conflict with pa 201510058849Details
remodel basement, add 1 bathroom, 1 laundry room. remodel & add 1 half bathroom on main floor. replace basement windows (7), no conflict with pa 201510058849 | $86,000 |
| Feb 12, 2015 | Completed final sign-off Jun 2015 | 146 Seal Rock Dr | remove stucco from front of house, install new plywood & insulation, install new lathe & stucco, install all new windows, remodel both 1st and 2nd flr bathrooms.Details
remove stucco from front of house, install new plywood & insulation, install new lathe & stucco, install all new windows, remodel both 1st and 2nd flr bathrooms. | $56,000 |
| Dec 3, 2014 | Completed final sign-off Jul 2016 | 1066 Francisco St | enclose / rebuild (e) stair to 3rd floor. new roof deck @ (e) rear roof. reconfigure (e) bath & closet @ 3rd floor.Details
enclose / rebuild (e) stair to 3rd floor. new roof deck @ (e) rear roof. reconfigure (e) bath & closet @ 3rd floor. | $100,000 |