Palumbo Construction Llc
- Based in
- Fremont
- On San Francisco permits
- Jun 2023 to Apr 2025
- Last 24 months
- 1 permit filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2025 | Completed final sign-off May 2025 | 1659 Dolores St | widen closet opening from 36" to 72". install header 4 x 8 on non loard bearing wallDetails
widen closet opening from 36" to 72". install header 4 x 8 on non loard bearing wall | $5,000 |
| Jul 10, 2023 | Completed final sign-off Oct 2023 | 275 Orizaba Av | replace all windows. milgrad vynil tuscany series low-e title 24. street visible the five windows at the front to be hung wood aluminum clad windowsDetails
replace all windows. milgrad vynil tuscany series low-e title 24. street visible the five windows at the front to be hung wood aluminum clad windows | $10,000 |
| Jun 29, 2023 | Never finaled issued Jun 2023, no final | 275 Orizaba Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $43,650 |