Back to bathroom remodel contractors
Pagan Construction, Llc
- Based in
- San Rafael
- On San Francisco permits
- Jul 2012 to Aug 2025
- Last 24 months
- 2 permits filed
15 permits since 2000: 9 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2025 | Completed final sign-off Apr 2026 | 2030 Green St | remodel master bathroom in kind, install new tub, vanity, sink, lights, fan, toilet, shower valves, shower, tiles, drywall, 1 door. repair water damage at garage ceilingDetails
remodel master bathroom in kind, install new tub, vanity, sink, lights, fan, toilet, shower valves, shower, tiles, drywall, 1 door. repair water damage at garage ceiling | $50,000 |
| Apr 28, 2021 | Completed final sign-off Sep 2021 | 3131 Divisadero St | remodel guest bathroom: install (n) toilet,vanity, shower, ceiling fan, gfi outlet, replace door from bedroom to bathroom. remodel in-kind. comply w/ cel150.0(k)5. interior door replace in (e) opening.Details
remodel guest bathroom: install (n) toilet,vanity, shower, ceiling fan, gfi outlet, replace door from bedroom to bathroom. remodel in-kind. comply w/ cel150.0(k)5. interior door replace in (e) opening. | $30,000 |
| Feb 12, 2020 | Never finaled filed Feb 2020, never issued | 3057 Market St | seismic upgrade of building, interior remodel (kitchen/bathroom/trim);open wall for electrical work,plumbing,mechanical,insulation; replace all windows (replace 4 front wdws w/ milgard alum series casement/fixed/casement arrangement);drywall garage area, fire rate;door & trim/paint.Details
seismic upgrade of building, interior remodel (kitchen/bathroom/trim);open wall for electrical work,plumbing,mechanical,insulation; replace all windows (replace 4 front wdws w/ milgard alum series casement/fixed/casement arrangement);drywall garage area, fire rate;door & trim/paint. | $160,000 |
| May 7, 2019 | Completed final sign-off Nov 2019 | 380 Bartlett St | unit # 301: restore from water damage, kitchen area, hall replace sheetrock, add outlets in kitchen to code, reinstall hot water heater, reinstall lite concrete floor. replace bathroom shower valve, toilet.Details
unit # 301: restore from water damage, kitchen area, hall replace sheetrock, add outlets in kitchen to code, reinstall hot water heater, reinstall lite concrete floor. replace bathroom shower valve, toilet. | $30,000 |
| May 24, 2018 | Expired or cancelled cancelled Jan 2019 | 3572 Pierce St | remodel kitchen and bathroom from fire damaged, new cabinet, electrical, plmg work and painting. no change of extg floor plan.Details
remodel kitchen and bathroom from fire damaged, new cabinet, electrical, plmg work and painting. no change of extg floor plan. | $90,000 |
| Sep 2, 2014 | Completed final sign-off Mar 2015 | 1546 18th St | remodel kitchen and bathroom includning electrical and plumbing. new electrical panel.Details
remodel kitchen and bathroom includning electrical and plumbing. new electrical panel. | $40,000 |