Pacific Star Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Aug 2013
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 30, 2013 | Completed final sign-off Oct 2013 | 9 Southern Heights Av | dry rot repair at deck, sister joists, add (n) header.Details
dry rot repair at deck, sister joists, add (n) header. | $20,000 |
| Jul 24, 2013 | Completed final sign-off Oct 2013 | 9 Southern Heights Av | repair (e) front balconies on 2nd and 3rd floor and water proof. work not exceed more than 50%. replace about 5 joist 4'long and remove subfloor.Details
repair (e) front balconies on 2nd and 3rd floor and water proof. work not exceed more than 50%. replace about 5 joist 4'long and remove subfloor. | $10,000 |
| Apr 7, 2011 | Completed final sign-off May 2011 | 526 Arlington St | remodel (e)1 bathroom on 2nd flr; remove & replace 4-windows, 1-facing street.Details
remodel (e)1 bathroom on 2nd flr; remove & replace 4-windows, 1-facing street. | $14,000 |
| Jan 26, 2011 | Completed final sign-off Mar 2011 | 9 Southern Heights Av | remove (e) sheetrock (walls & ceiling), remove (e) tile (floor & shower walls) & repl with new, remove existing tub and repl with new, upgrade electrical & install new outlets for vanity (top) & toilet area, upgrade shower valves & faucets, install new vanity and sinks, repl 2 existing windows, instDetails
remove (e) sheetrock (walls & ceiling), remove (e) tile (floor & shower walls) & repl with new, remove existing tub and repl with new, upgrade electrical & install new outlets for vanity (top) & toilet area, upgrade shower valves & faucets, install new vanity and sinks, repl 2 existing windows, inst | $10,000 |
| Oct 16, 2007 | Completed final sign-off Nov 2007 | 1113 York St | replacing existing exterior stair and landings for code compliance. in compliance of 3-r report.Details
replacing existing exterior stair and landings for code compliance. in compliance of 3-r report. | $14,000 |