Back to bathroom remodel contractors
Pacific International Engineering
- Based in
- San Francisco
- On San Francisco permits
- Mar 2025 to Oct 2025
- Last 24 months
- 6 permits filed
6 permits since 2000: 5 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 in progress. Typically 12 days from filing to permit and 70 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2025 | Completed final sign-off Dec 2025 | 1707 La Salle Av | add one full bathroom on the 1st flDetails
add one full bathroom on the 1st fl | $10,000 |
| Sep 5, 2025 | Completed final sign-off May 2026 | 2207 25th Av | remodel 2nd floor kitchen and change existing bath and closet to 1 bath and 1 master bath.Details
remodel 2nd floor kitchen and change existing bath and closet to 1 bath and 1 master bath. | $10,000 |
| Apr 11, 2025 | In progress issued Oct 2025 | 1486 Underwood Av | comply w/ nov #20170981:legalize new wall frame of skylight on 2nd fl. bathroom remodel. new windows gardrail on 2nd fl. (e) garage remain no work.Details
comply w/ nov #20170981:legalize new wall frame of skylight on 2nd fl. bathroom remodel. new windows gardrail on 2nd fl. (e) garage remain no work. | $25,000 |
| Mar 21, 2025 | Completed final sign-off Jun 2025 | 11 Lobos St | remodel (e) kitchen, (e)bathroom. add 1 new bathroom at 2/f. remodel (e) bathroom in-kind at g/f. install 2 new skylights within existing rafter bays.Details
remodel (e) kitchen, (e)bathroom. add 1 new bathroom at 2/f. remodel (e) bathroom in-kind at g/f. install 2 new skylights within existing rafter bays. | $85,000 |