Pacific Edge Construction Inc

Contractor license
984783
State license record
Based in
San Rafael
On San Francisco permits
Dec 2013 to Jul 2026
Last 24 months
6 permits filed

44 permits since 2000: 40 completed, 3 in progress, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Bathroom remodel permits

AllRoof deck 4Deck 1Stairs 2Kitchen remodel 10Bathroom remodel 15

15 bathroom remodel permits: 13 completed, 2 in progress. Typically 113 days from filing to permit and 624 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 7, 2026In progress
issued Aug 2026
826 Haight Stremodel (e) dining room, bathroom, add powder room (toilet+ lav sink) at hall.
Details
Permit
202604079041
Permit issued
Aug 10, 2026

remodel (e) dining room, bathroom, add powder room (toilet+ lav sink) at hall.

Open the permit page

$38,000
Mar 13, 2026In progress
issued May 2026
1304 Valencia Ststructural revision to pa# 202204202645-s1, replace an existing unreinforced masonry foundation in poor condition along property line with poured reinforced concrete foundation. add 1-bathroom with 1-sink and 1-toilet within (e) floor plan on 3rd floor.
Details
Permit
202510248098
Permit issued
May 1, 2026

structural revision to pa# 202204202645-s1, replace an existing unreinforced masonry foundation in poor condition along property line with poured reinforced concrete foundation. add 1-bathroom with 1-sink and 1-toilet within (e) floor plan on 3rd floor.

Open the permit page

$13,201
Aug 23, 2024Completed
final sign-off Apr 2026
1345 Masonic Avremodel (e) second bathroom on 3rd story. to include removal of glass block non bearing wall and replace with pony wall with glass
Details
Permit
202408239327
Permit issued
May 13, 2025
Final sign-off
Apr 7, 2026

remodel (e) second bathroom on 3rd story. to include removal of glass block non bearing wall and replace with pony wall with glass

Open the permit page

$15,000
Sep 13, 2023Completed
final sign-off Sep 2025
160 Hancock Sta partial remodel to include: window replacement, relocating non-bearing interior partions, new interior finishes, kitchen and (3) bath remodel replace (e) roof deck guard rails, replace a portion of the siding
Details
Permit
202309136438
Permit issued
Jan 4, 2024
Final sign-off
Sep 17, 2025

a partial remodel to include: window replacement, relocating non-bearing interior partions, new interior finishes, kitchen and (3) bath remodel replace (e) roof deck guard rails, replace a portion of the siding

Open the permit page

$250,000
Jul 21, 2023Completed
final sign-off Jul 2024
364 17th Avkitchen remodel-remove wall, voluntary shearwalls @ garage, remodel existing garage level bathroom from half to full bath. legalize existing office at ground floor
Details
Permit
202307212707
Permit issued
Aug 11, 2023
Final sign-off
Jul 31, 2024

kitchen remodel-remove wall, voluntary shearwalls @ garage, remodel existing garage level bathroom from half to full bath. legalize existing office at ground floor

Open the permit page

$60,000
Jan 23, 2023Completed
final sign-off May 2023
2030 Union Stcannabis dispensiing, demo/relocate internal nonbaring prtitions/doors, upgrade bathroom to ada, install counters w/ada accessiblity, upgrade fire proofing of ceiling, install new ceiling lighting, internal roll down security gates, new exterior lights. signage under separate permit.
Details
Permit
202301230573
Permit issued
Jan 30, 2023
Final sign-off
May 30, 2023

cannabis dispensiing, demo/relocate internal nonbaring prtitions/doors, upgrade bathroom to ada, install counters w/ada accessiblity, upgrade fire proofing of ceiling, install new ceiling lighting, internal roll down security gates, new exterior lights. signage under separate permit.

Open the permit page

$50,000
Dec 20, 2022Completed
final sign-off Jan 2025
1340 Clay Stunit 801 - new countertops; 2 bathroom remodel, retrofit ceiling; can lights in kitchen; replace window seals, painting and tiling
Details
Permit
202212208710
Permit issued
Dec 20, 2022
Final sign-off
Jan 9, 2025

unit 801 - new countertops; 2 bathroom remodel, retrofit ceiling; can lights in kitchen; replace window seals, painting and tiling

Open the permit page

$90,000
Jul 26, 2022Completed
final sign-off Nov 2024
1583 18th Avinterior remodel of 1 kitchen and 3 baths. taking sf from the (e) garage to become conditioned space. infill (1) lightwell facing a blank wall.
Details
Permit
202207269280
Permit issued
Dec 14, 2022
Final sign-off
Nov 6, 2024

interior remodel of 1 kitchen and 3 baths. taking sf from the (e) garage to become conditioned space. infill (1) lightwell facing a blank wall.

Open the permit page

$130,000
Nov 3, 2021Completed
final sign-off Feb 2022
1432 Guerrero Stbathroom in kind remodel
Details
Permit
202111031685
Permit issued
Nov 3, 2021
Final sign-off
Feb 1, 2022

bathroom in kind remodel

Open the permit page

$20,000
Sep 3, 2021Completed
final sign-off Apr 2025
2424 Polk Stchange of use authorized per #2020-011603cua & tenant improvements- bring bathroom & 2nd front entrance to ada compliance, add partitions for retail, offices, storage & smoking areas. install reflectv ceiling & exterior lighting. replace glazing on 2nd front exit dr w/ metallic security door.
Details
Permit
202109037791
Permit issued
Mar 9, 2022
Final sign-off
Apr 8, 2025

change of use authorized per #2020-011603cua & tenant improvements- bring bathroom & 2nd front entrance to ada compliance, add partitions for retail, offices, storage & smoking areas. install reflectv ceiling & exterior lighting. replace glazing on 2nd front exit dr w/ metallic security door.

Open the permit page

$100,000
Jul 28, 2021Completed
final sign-off Apr 2023
8 Miguel Stinterior remodel, adding 1 new bathroom and 2 bedrooms and laundry withing existing building.
Details
Permit
202107285261
Permit issued
Aug 11, 2021
Final sign-off
Apr 27, 2023

interior remodel, adding 1 new bathroom and 2 bedrooms and laundry withing existing building.

Open the permit page

$62,000
Apr 9, 2021Completed
final sign-off May 2024
2909 26th Avexcavation of (e) crawlspace to add 1,080 gross sqft to include 3 bedrooms, 1 bath and an excercise room. condition a portion of an (e) garage for a family room. add a bay window at the rear. no work at front exterior.
Details
Permit
202104098249
Permit issued
Aug 27, 2021
Final sign-off
May 24, 2024

excavation of (e) crawlspace to add 1,080 gross sqft to include 3 bedrooms, 1 bath and an excercise room. condition a portion of an (e) garage for a family room. add a bay window at the rear. no work at front exterior.

Open the permit page

$197,000
Sep 23, 2020Completed
final sign-off Oct 2023
127 12th Av3rd level-interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.no new square footage.concurrent work at the ground level and second level at 125 12th avenue will be submitted under separate building permit.
Details
Permit
202009234814
Permit issued
Feb 17, 2021
Final sign-off
Oct 17, 2023

3rd level-interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.no new square footage.concurrent work at the ground level and second level at 125 12th avenue will be submitted under separate building permit.

Open the permit page

$158,400
Sep 23, 2020Completed
final sign-off Oct 2023
125 12th Avinterior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.garage door replaced and widened 1 foot to 8'w. x 7'h. footing & struct work for interior work on 2nd flr above. concurrent work on third level 127 12th ave. is being submitted under separate permit.
Details
Permit
202009234817
Permit issued
Apr 19, 2021
Final sign-off
Oct 17, 2023

interior remodel including kitchen and (1) bath. (1) 1/2 bath to be added.garage door replaced and widened 1 foot to 8'w. x 7'h. footing & struct work for interior work on 2nd flr above. concurrent work on third level 127 12th ave. is being submitted under separate permit.

Open the permit page

$188,400
Aug 12, 2019Completed
final sign-off Mar 2021
2112 18th St231 sq ft ground flr addition under an (e) room and remodel to incl 1 bed, 1 bath, fam room and garage. 15 sq ft 2nd flr addition and remodel to incl (e) kitchen and baths.
Details
Permit
201908128500
Permit issued
Oct 8, 2019
Final sign-off
Mar 16, 2021

231 sq ft ground flr addition under an (e) room and remodel to incl 1 bed, 1 bath, fam room and garage. 15 sq ft 2nd flr addition and remodel to incl (e) kitchen and baths.

Open the permit page

$225,000