Back to bathroom remodel contractors
Pacific Craftsmen
- Based in
- Half Moon Bay
- On San Francisco permits
- Oct 2006 to Oct 2021
- Last 24 months
- 0 permits filed
23 permits since 2000: 14 completed, 3 never finaled, 6 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 6 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 13, 2008 | Completed final sign-off Apr 2009 | 1281 09th Av | interior, non-structural remodel of existing restaurant. improvments made to kitchen and dining ada bathroom added.Details
interior, non-structural remodel of existing restaurant. improvments made to kitchen and dining ada bathroom added. | $105,000 |
| Apr 2, 2008 | Expired or cancelled expired Feb 2010 | 508 14th St | remove walls and doors for proposed plan. remove csework in bathroom and sink for 1st floor. interior demo only.ti to be done under seperate permitDetails
remove walls and doors for proposed plan. remove csework in bathroom and sink for 1st floor. interior demo only.ti to be done under seperate permit | $2,000 |