Back to bathroom remodel contractors
Pacific Construction & Design**See Notes
- Based in
- Sunnyvale
- On San Francisco permits
- Oct 2014 to May 2018
- Last 24 months
- 0 permits filed
27 permits since 2000: 18 completed, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 6 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 8 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2018 | Expired or cancelled cancelled Jan 2026 | 155 Cleo Rand Av | bathroom floor joists structural only. proposed sewer line 3" diameter to pass through floor forming as shown in the flooring layout. revision to 201801188972 maher naDetails
bathroom floor joists structural only. proposed sewer line 3" diameter to pass through floor forming as shown in the flooring layout. revision to 201801188972 maher na | $1,500 |
| Jan 18, 2018 | Completed final sign-off Apr 2019 | 155 Cleo Rand Av | remodel 3rd floor master bathroom - remove & rebuild walls, install new toilet, w/d, sink, vanity, shower trim as per code, new floor & wall tile, 2 automated sliding glass doors. n/a for maher.Details
remodel 3rd floor master bathroom - remove & rebuild walls, install new toilet, w/d, sink, vanity, shower trim as per code, new floor & wall tile, 2 automated sliding glass doors. n/a for maher. | $25,000 |
| Apr 25, 2017 | Completed final sign-off Jun 2017 | 46 Museum Wy | bathroom remodel with shower in same locationDetails
bathroom remodel with shower in same location | $20,000 |
| Mar 2, 2017 | Completed final sign-off Jul 2017 | 409 Holyoke St | remodel 3 bathrooms. upgrade plumbing and electrical to code in the baths. like for like . not removing any walls or moving locations at showers or toilets.Details
remodel 3 bathrooms. upgrade plumbing and electrical to code in the baths. like for like . not removing any walls or moving locations at showers or toilets. | $50,000 |
| Jan 11, 2017 | Completed final sign-off Apr 2017 | 458 Hearst Av | all work on 2/f- remodel bath, add 1/2 bath at closet. remove non load bearing wallsDetails
all work on 2/f- remodel bath, add 1/2 bath at closet. remove non load bearing walls | $20,000 |
| Jan 4, 2017 | Never finaled issued Jan 2017, no final | 520 45th Av | remodel kitchen and (1) bathroom, changing lighting, replace (2) windows, change out cabinets & vanity. same for sameDetails
remodel kitchen and (1) bathroom, changing lighting, replace (2) windows, change out cabinets & vanity. same for same | $50,000 |
| Nov 14, 2016 | Never finaled issued Nov 2016, no final | 304 Gold Mine Dr | kitchen remodel. gfi in bathroom.Details
kitchen remodel. gfi in bathroom. | $7,700 |
| Sep 26, 2016 | Completed final sign-off Dec 2016 | 1632 Grove St | remodel kitchen and bathroom. no walls added or removedDetails
remodel kitchen and bathroom. no walls added or removed | $50,000 |
| Sep 1, 2016 | Completed final sign-off Mar 2017 | 15 Quintara St | bathroom remodel - replace all bathroom fixtures, tile and floor; add 3-2 recess lights.Details
bathroom remodel - replace all bathroom fixtures, tile and floor; add 3-2 recess lights. | $15,000 |
| Jul 14, 2016 | Completed final sign-off Aug 2016 | 544 Magellan Av | replace five windows at the 2nd fl guest bedroom & bath at the back of the house.Details
replace five windows at the 2nd fl guest bedroom & bath at the back of the house. | $5,000 |
| Oct 17, 2014 | Completed final sign-off Mar 2019 | 76 Cielito Dr | ground floor rehabilitation & legalization.horizontal addition on second floor kitchen & bathroom rehabilitation & minor light well addition.Details
ground floor rehabilitation & legalization.horizontal addition on second floor kitchen & bathroom rehabilitation & minor light well addition. | $96,000 |