Pacific Construction Company Inc
- Based in
- Millbrae
- On San Francisco permits
- Jul 2012 to May 2026
- Last 24 months
- 3 permits filed
18 permits since 2000: 15 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 4 days from filing to permit and 187 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2026 | Completed final sign-off Jul 2026 | 1454 Waller St | replace 2 toilets in bathrooms like for like. add new independent circuits to subpanel, 5 independent circuits, sealing of (2) windows from water intrusion, re seal window. street facing window.Details
replace 2 toilets in bathrooms like for like. add new independent circuits to subpanel, 5 independent circuits, sealing of (2) windows from water intrusion, re seal window. street facing window. | $14,000 |
| Aug 14, 2024 | In progress filed Aug 2024, not yet issued | 35 Margaret Av | to remodel (e) bath at ground level and to be legalized.Details
to remodel (e) bath at ground level and to be legalized. | $25,000 |
| Jan 4, 2018 | Completed final sign-off Nov 2024 | 35 Margaret Av | replace (e) windows with same size (double panel/anderson eagle e series). framing repairs decay. upgrade window headers. exterior siding replacement front & back only. exterior wall insulation. int/ext. painting,sheetrock replacement at ext. wall. two baths repair. rewire elec. water heater &Details
replace (e) windows with same size (double panel/anderson eagle e series). framing repairs decay. upgrade window headers. exterior siding replacement front & back only. exterior wall insulation. int/ext. painting,sheetrock replacement at ext. wall. two baths repair. rewire elec. water heater & | $180,000 |
| May 17, 2016 | Completed final sign-off Oct 2016 | 414 Hearst Av | replacement of kitchen cabinets and installation of new island with electrical outlets. converting (e) bedroom into new bathroom with new plumbing/electrical, while converting old bathroom into laundry room. (e) laundry rm - becomes pantryDetails
replacement of kitchen cabinets and installation of new island with electrical outlets. converting (e) bedroom into new bathroom with new plumbing/electrical, while converting old bathroom into laundry room. (e) laundry rm - becomes pantry | $70,000 |
| Aug 1, 2013 | Completed final sign-off Apr 2014 | 49 Sunview Dr | ground fl development with new bathroom, family room, guest room, closets, laundry area, new window. interior remodel includes kitchen and bath remodel, new opening between kitchen and living room. replace all windows, wall and floor finishes.Details
ground fl development with new bathroom, family room, guest room, closets, laundry area, new window. interior remodel includes kitchen and bath remodel, new opening between kitchen and living room. replace all windows, wall and floor finishes. | $58,000 |