Back to bathroom remodel contractors
Pacific Bay Construction
- Based in
- Antioch
- On San Francisco permits
- Aug 2026 to Aug 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 1 days from filing to permit and 41 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2026 | Completed final sign-off Sep 2026 | 88 King St | unit 718: partial remodel of 2 existing bathrooms. hall bath: tub shower to shower pan conversion, replace pocket door, relocate gfci, install wet-location recessed light, replace exhaust fan, install tile base trim, paint & install accessories. primary bath: remove shower glass and railing,Details
unit 718: partial remodel of 2 existing bathrooms. hall bath: tub shower to shower pan conversion, replace pocket door, relocate gfci, install wet-location recessed light, replace exhaust fan, install tile base trim, paint & install accessories. primary bath: remove shower glass and railing, | $24,000 |