Back to bathroom remodel contractors
P P A Development Inc
- Based in
- San Carlos
- On San Francisco permits
- May 2008 to Jan 2016
- Last 24 months
- 0 permits filed
16 permits since 2000: 11 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 2 expired or cancelled. Typically 1 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2014 | Completed final sign-off Dec 2015 | 1643 Pacific Av | g/f -non-structural, commercial interior tenant improvement for a retail coffee & pastry store, (n) non-load bearing partitions. no kitchen, food is prepared off-site. (n) plumbing for prep sinks & dishwashing machine, (e) bathroom has no change. separate mep & shopfront signage permit.Details
g/f -non-structural, commercial interior tenant improvement for a retail coffee & pastry store, (n) non-load bearing partitions. no kitchen, food is prepared off-site. (n) plumbing for prep sinks & dishwashing machine, (e) bathroom has no change. separate mep & shopfront signage permit. | $65,000 |
| Oct 29, 2014 | Expired or cancelled expired Sep 2017 | 1749 Dolores St | create 2nd dwelling unit in (e) lower level rooms, add (n) kitchen. change occupancy from single to 2-dwelling unit. no increase to bldg square footage. create (n) deck over (e) garage roof area. create (n) full bathroom, alter (e) bathroom on 2nd fl.Details
create 2nd dwelling unit in (e) lower level rooms, add (n) kitchen. change occupancy from single to 2-dwelling unit. no increase to bldg square footage. create (n) deck over (e) garage roof area. create (n) full bathroom, alter (e) bathroom on 2nd fl. | $5,000 |
| Aug 18, 2014 | Completed final sign-off Sep 2014 | 4233 24th St | remove and replace damaged wood (dry rot) due to leak in ceiling of 2/f bathroom. n/a ordinance #155-13.Details
remove and replace damaged wood (dry rot) due to leak in ceiling of 2/f bathroom. n/a ordinance #155-13. | $2,000 |
| Aug 5, 2011 | Completed final sign-off Aug 2012 | 1883 Green St | remodel existing three (2-unit) building. remove walls, structural seismic upgrade, remodel 3 bathrooms, remodel 2 kitchens, add 1 new bathroom.Details
remodel existing three (2-unit) building. remove walls, structural seismic upgrade, remodel 3 bathrooms, remodel 2 kitchens, add 1 new bathroom. | $231,000 |
| Jun 9, 2008 | Expired or cancelled expired Sep 2009 | 535 Spruce St | add new full bathroom on ground floorDetails
add new full bathroom on ground floor | $10,000 |