Back to bathroom remodel contractors
P K N Development
- Based in
- Diablo
- On San Francisco permits
- Oct 2010 to Feb 2015
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 7 days from filing to permit and 298 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2014 | Completed final sign-off Jan 2015 | 690 Market St | unit #1404: replace countertop at kitchen and bathrooms. remove non bearing partition walls. add recess lights.Details
unit #1404: replace countertop at kitchen and bathrooms. remove non bearing partition walls. add recess lights. | $5,000 |
| Apr 3, 2013 | Completed final sign-off Dec 2014 | 2543 35th Av | comply w/complaint #201392711 - single non-structural wall & door demolition, legalize unpermitted family room, full bathroom, 2 storage rooms, new 1-hr construction with jnew self closing & self latching 1-3/8" solid wood door to create garage separation. no work @ 2nd floor.Details
comply w/complaint #201392711 - single non-structural wall & door demolition, legalize unpermitted family room, full bathroom, 2 storage rooms, new 1-hr construction with jnew self closing & self latching 1-3/8" solid wood door to create garage separation. no work @ 2nd floor. | $40,000 |
| Dec 6, 2012 | Completed final sign-off Oct 2013 | 65 Cragmont Av | revision to 201112050063-s. reduce master bath to add laundry closet at 2nd fl. reduce skylights 5 to 2 skylights. reduce master bathroom to add laundry closet. change laundry room to utility room. revised drainage plan, add two windows. delete (e)Details
revision to 201112050063-s. reduce master bath to add laundry closet at 2nd fl. reduce skylights 5 to 2 skylights. reduce master bathroom to add laundry closet. change laundry room to utility room. revised drainage plan, add two windows. delete (e) |