Back to bathroom remodel contractors
P J Hegarty Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Mar 2017
- Last 24 months
- 0 permits filed
33 permits since 2000: 22 completed, 8 never finaled, 3 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 78 days from filing to permit and 370 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2015 | Completed final sign-off Oct 2017 | 314 Walnut St | horizontal addition at rear all flor. remodel kitchen & one bathroom. remove 3 bathrooms and provide 4 new bathrooms. remove walls at 1st flr. provide new elevator . remove (e) stairs & replace. provide new roof decks at 1st & 3rd flr. provide new balcony at 2nd flr master bedroom.Details
horizontal addition at rear all flor. remodel kitchen & one bathroom. remove 3 bathrooms and provide 4 new bathrooms. remove walls at 1st flr. provide new elevator . remove (e) stairs & replace. provide new roof decks at 1st & 3rd flr. provide new balcony at 2nd flr master bedroom. | $375,000 |
| Dec 30, 2014 | Completed final sign-off Dec 2018 | 38 Liberty St | restore original victorian facade, new 3nd floor and roof deck, new rear yard additon, new garage & curb cut, remodel kitchen & bathrooms.Details
restore original victorian facade, new 3nd floor and roof deck, new rear yard additon, new garage & curb cut, remodel kitchen & bathrooms. | $590,000 |
| Feb 28, 2013 | Completed final sign-off Mar 2013 | 40 Palm Av | replace damaged ceiling sheetrock in powder room and full bath, install exhaust fan in full bathDetails
replace damaged ceiling sheetrock in powder room and full bath, install exhaust fan in full bath | $1,200 |
| Aug 16, 2012 | Completed final sign-off Dec 2012 | 2819 Pine St | remodel exisitng master bath, upper floor additional bath in existing guest bedroom, upper floor new window in front wood.Details
remodel exisitng master bath, upper floor additional bath in existing guest bedroom, upper floor new window in front wood. | $40,189 |
| Jul 13, 2012 | Completed final sign-off Jan 2014 | 32 Pleasant St | remodel kitchen-remove & replace cabinets, sinks, fixtures. remodel bathroom-remove & replace bath tub, sink & toilet. remove & replace doors (interior only). remove fireplace in #34. no structural work, no change in partitions.Details
remodel kitchen-remove & replace cabinets, sinks, fixtures. remodel bathroom-remove & replace bath tub, sink & toilet. remove & replace doors (interior only). remove fireplace in #34. no structural work, no change in partitions. | $36,554 |
| Sep 30, 2011 | Completed final sign-off Dec 2011 | 125 Edgewood Av | additional bathroom on 2nd floor removing sheetrock for additional outlets and plumbing. additional skylightDetails
additional bathroom on 2nd floor removing sheetrock for additional outlets and plumbing. additional skylight | $9,700 |
| Nov 4, 2010 | Completed final sign-off Nov 2011 | 112 Mateo St | addition of new roof dormer to (e) 2nd floor bedroom level to be used for new bathroom & closet. addition of new deck @ rear yard.Details
addition of new roof dormer to (e) 2nd floor bedroom level to be used for new bathroom & closet. addition of new deck @ rear yard. | $25,000 |
| May 7, 2009 | Completed final sign-off Jan 2014 | 36 Pleasant St | addition of 2 new floors, 2 onsite parking spaces, conversion of residential duplex into residential triplex. no horizontal extension. addition of roof decks. kitchen/bath remodel at existing 2nd and 3rd floors. addition of elevator.Details
addition of 2 new floors, 2 onsite parking spaces, conversion of residential duplex into residential triplex. no horizontal extension. addition of roof decks. kitchen/bath remodel at existing 2nd and 3rd floors. addition of elevator. | $600,000 |