Permit GraphShortlistSan Francisco building permits since 2000

P H Construction And Painting

Contractor license
841682
State license record
Based in
Daly City
On San Francisco permits
Jan 2006 to Sep 2026
Last 24 months
2 permits filed

32 permits since 2000: 30 completed, 1 in progress, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllDeck 2Stairs 1Kitchen remodel 12Bathroom remodel 12

2 deck permits: 2 completed. Typically 9 days from filing to permit and 172 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Sep 18, 2019Completed
final sign-off Oct 2019
127 Romain Streplace approx 150 sq ft of damage siding in back of the house and repair existing deck less than 50%. repair in kind. not visible from the street.
Details
Permit
201909181927
Status
complete
Filed
Sep 18, 2019
Permit issued
Sep 18, 2019
Final sign-off
Oct 21, 2019
Declared cost
$25,000
Address
127 Romain St

replace approx 150 sq ft of damage siding in back of the house and repair existing deck less than 50%. repair in kind. not visible from the street.

Open the permit page

$25,000
Sep 9, 2019Completed
final sign-off Aug 2020
131 Melrose Avremove master bedroom window and replace with a sliding door. install a pre manufactured deck to the rear of the building at master bedroom (n) sliding door
Details
Permit
201909091073
Status
complete
Filed
Sep 9, 2019
Permit issued
Sep 27, 2019
Final sign-off
Aug 4, 2020
Declared cost
$15,000
Address
131 Melrose Av

remove master bedroom window and replace with a sliding door. install a pre manufactured deck to the rear of the building at master bedroom (n) sliding door

Open the permit page

$15,000