Back to bathroom remodel contractors
Ortiz Tile
- Based in
- Livermore
- On San Francisco permits
- Feb 2013 to Feb 2013
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 36 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2013 | Completed final sign-off Apr 2013 | 325 Berry St | wpork in unit 301: remove (e) tile in hall bath (tub surround). remove (e0 tub and install shower pan. drain to remain, same location.install water proofing, membranechoralox shower pan. install cement board for tile backing on shower walls. install tile, grout, and plumbing finish trim.Details
wpork in unit 301: remove (e) tile in hall bath (tub surround). remove (e0 tub and install shower pan. drain to remain, same location.install water proofing, membranechoralox shower pan. install cement board for tile backing on shower walls. install tile, grout, and plumbing finish trim. | $12,000 |