Opus Pacific Development
- Based in
- Daly City
- On San Francisco permits
- Apr 2015 to May 2026
- Last 24 months
- 5 permits filed
20 permits since 2000: 12 completed, 4 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 4 completed, 1 never finaled. Typically 70 days from filing to permit and 624 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2023 | Completed final sign-off Sep 2025 | 16 Sherwood Ct | 2/f remove wall between kitchen & dining/ living areas, remodel kitchen, new exterior folding door to new rear yard deck & stairs to grade.Details
2/f remove wall between kitchen & dining/ living areas, remodel kitchen, new exterior folding door to new rear yard deck & stairs to grade. | $80,759 |
| Dec 13, 2021 | Never finaled issued Dec 2021, no final | 288 Juanita Wy | 1/f: convert portion of garage and remodel (e) office to new office/bedroom and new full bath. 2/f: remove wall between breakfast romm and kitchen for new larger kitchen. enlarge and remodel (e) bath, new 2/f deck and stairs at rear yard.Details
1/f: convert portion of garage and remodel (e) office to new office/bedroom and new full bath. 2/f: remove wall between breakfast romm and kitchen for new larger kitchen. enlarge and remodel (e) bath, new 2/f deck and stairs at rear yard. | $159,029 |
| Jun 15, 2018 | Completed final sign-off Sep 2019 | 2218 Lyon St | revisions to ba # 201504032798. eliminate new post footing for proposed deck. maher n/aDetails
revisions to ba # 201504032798. eliminate new post footing for proposed deck. maher n/a | |
| Mar 21, 2017 | Completed final sign-off Oct 2020 | 68 Agua Wy | ground floor to be developed for new bedrooms. bathrooms & office. horizontal addition to the rer, new 2nd floor wood deck & 1st floor patio, kitchen remodel.Details
ground floor to be developed for new bedrooms. bathrooms & office. horizontal addition to the rer, new 2nd floor wood deck & 1st floor patio, kitchen remodel. | $260,000 |
| Apr 3, 2015 | Completed final sign-off Sep 2019 | 2218 Lyon St | (e) kitchen renovation, addition habitable space for dining area on 2nd floor connecting with (n) wood decking, works including (n) french door, (n) double slider door between dining area and wood deck; a wooden stair , etc. ** maher: compliance with ordinance no# 155-13 not required **Details
(e) kitchen renovation, addition habitable space for dining area on 2nd floor connecting with (n) wood decking, works including (n) french door, (n) double slider door between dining area and wood deck; a wooden stair , etc. ** maher: compliance with ordinance no# 155-13 not required ** | $25,000 |