Opulent Power Solutions
- Based in
- Anaheim
- On San Francisco permits
- Jul 2024 to Jul 2024
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2024 | Completed final sign-off Nov 2025 | 491 Bay Shore Bl | installation of a 510kwdc, unirac semi-ballasted, rooftop photovoltaic solar energy system, consisting of 954-heliene, 535-solar panels, 1-csi 100k inverter, 4-csi 50k inverter, 6-csi 25k inverterDetails
installation of a 510kwdc, unirac semi-ballasted, rooftop photovoltaic solar energy system, consisting of 954-heliene, 535-solar panels, 1-csi 100k inverter, 4-csi 50k inverter, 6-csi 25k inverter | $250,000 |