Back to bathroom remodel contractors
On Tung Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2016 to May 2025
- Last 24 months
- 2 permits filed
16 permits since 2000: 15 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 30 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2025 | Completed final sign-off Jan 2026 | 1921 Taraval St | unit 4: convert (e) storage room, laundry room to bedroom. add 1 new bathroom & convert (e) powder room to full bathroom. install 2 wetbar. all work at g/f. (space for unit 4)Details
unit 4: convert (e) storage room, laundry room to bedroom. add 1 new bathroom & convert (e) powder room to full bathroom. install 2 wetbar. all work at g/f. (space for unit 4) | $110,000 |
| Sep 30, 2022 | Completed final sign-off Jan 2024 | 567 Wildwood Wy | 2/f: create open floor plan for living/dining room/kitchen, reconfigure interior staircase, add primary bath, reconfigure/remodel full bath; ground f: shift rear wall to line w/(e) 2/f wall, reconfigure fmily room, ad (2) bedrooms & full bathroom behind garage; replace furnace & water heaterDetails
2/f: create open floor plan for living/dining room/kitchen, reconfigure interior staircase, add primary bath, reconfigure/remodel full bath; ground f: shift rear wall to line w/(e) 2/f wall, reconfigure fmily room, ad (2) bedrooms & full bathroom behind garage; replace furnace & water heater | $150,000 |
| Sep 14, 2022 | Completed final sign-off Sep 2023 | 2521 21st Av | remodel (e) kitchen, bathroom. construct 1 new bathroom. remove interior staircase & replace (e) sheet rock with new .all work on 2/f.Details
remodel (e) kitchen, bathroom. construct 1 new bathroom. remove interior staircase & replace (e) sheet rock with new .all work on 2/f. | $65,000 |
| Dec 23, 2020 | Completed final sign-off Aug 2021 | 240 Stratford Dr | remodel (e) bathroom. remove/replace fixtures w/ new at main floor.Details
remodel (e) bathroom. remove/replace fixtures w/ new at main floor. | $10,000 |
| Nov 13, 2019 | Completed final sign-off Jun 2021 | 220 Talbert St | 1) convert extg one bedroom to 2 bedroom. construct one ful bathroom at ground floor. 2)relocate extg kitchen, bathroom, add one new bathroom & convert extg kitchen space to bedroom at 2nd floor.Details
1) convert extg one bedroom to 2 bedroom. construct one ful bathroom at ground floor. 2)relocate extg kitchen, bathroom, add one new bathroom & convert extg kitchen space to bedroom at 2nd floor. | $68,000 |
| Feb 19, 2019 | Completed final sign-off Nov 2019 | 344 Ewing Tr | construct 2 bedrooms, 2 full bathroom & media room @ ground floor; remodel (e) kitchen, bathroom, add 1 new bathroom. in-fill central patio & replace sheet rock w/new @ 2nd floorDetails
construct 2 bedrooms, 2 full bathroom & media room @ ground floor; remodel (e) kitchen, bathroom, add 1 new bathroom. in-fill central patio & replace sheet rock w/new @ 2nd floor | $82,000 |
| Jan 22, 2019 | Completed final sign-off Nov 2019 | 23 Topeka Av | construct 2 bedroom, 2 full bath and media room at gr flDetails
construct 2 bedroom, 2 full bath and media room at gr fl | $62,000 |
| Jan 2, 2019 | Completed final sign-off May 2019 | 215 06th Av | 1)remodel extg kitchen, bathroom, add one new bath room, remove/replace new sheet rock and rewire new electrical/lighting at 2nd floor. 2)remove/replace/repair extg rear staircase down to rear yard.Details
1)remodel extg kitchen, bathroom, add one new bath room, remove/replace new sheet rock and rewire new electrical/lighting at 2nd floor. 2)remove/replace/repair extg rear staircase down to rear yard. | $58,000 |
| Jul 25, 2018 | Completed final sign-off Jan 2019 | 1473 Revere Av | remodel (e) kitchen & two bathrooms. convert existing bath to a master bedroom bath. remove load bearing wall between kitchen & living room. replace all windows. (front windows to be wood clad alum).Details
remodel (e) kitchen & two bathrooms. convert existing bath to a master bedroom bath. remove load bearing wall between kitchen & living room. replace all windows. (front windows to be wood clad alum). | $50,000 |
| Jan 19, 2018 | Completed final sign-off May 2018 | 512 Grafton Av | construct 2 bedrooms, 1 full bathroom, media room at ground floor. add 1 new bathroom @ 2nd floor. construct new deck w/staircase at rear of building (19'x8x36"h)Details
construct 2 bedrooms, 1 full bathroom, media room at ground floor. add 1 new bathroom @ 2nd floor. construct new deck w/staircase at rear of building (19'x8x36"h) | $40,000 |
| Oct 17, 2017 | Completed final sign-off Dec 2018 | 261 Rolph St | legalize exist. ground floor family room and bath. enclose space below exist. sunroom. conventional framing per building codeDetails
legalize exist. ground floor family room and bath. enclose space below exist. sunroom. conventional framing per building code | $60,000 |