Back to bathroom remodel contractors
Olympic Restoration
- Based in
- So San Francisco
- On San Francisco permits
- May 2000 to Apr 2005
- Last 24 months
- 0 permits filed
94 permits since 2000: 65 completed, 3 never finaled, 26 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 155 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2004 | Completed final sign-off Oct 2004 | 326 Capp St | repair water damage in kitchen/bath area.replace some drywall,paint & some flooringDetails
repair water damage in kitchen/bath area.replace some drywall,paint & some flooring | $8,000 |
| Mar 27, 2003 | Completed final sign-off Jun 2003 | 140 South Van Ness Av | water damage repair remodel dry wall repair paint baseboard replace linoleum in one bath room unitDetails
water damage repair remodel dry wall repair paint baseboard replace linoleum in one bath room unit | $15,000 |
| Jun 7, 2002 | Never finaled issued Jun 2002, no final | 595 18th Av | expansion of downstairs bathroom, remodel of upstairs bathroom, plaster & paintingDetails
expansion of downstairs bathroom, remodel of upstairs bathroom, plaster & painting | $39,000 |
| Sep 26, 2001 | Completed final sign-off Feb 2002 | 2665 Franklin St | replace plaster living room 238 sf hall,replace wiring l/r 238sf replace bath fixts. all materials aDetails
replace plaster living room 238 sf hall,replace wiring l/r 238sf replace bath fixts. all materials a | $10,000 |
| Aug 9, 2000 | Expired or cancelled expired Apr 2001 | 1327 Filbert St | remove and replacement of hot tub and shower in master bath after fireDetails
remove and replacement of hot tub and shower in master bath after fire | $4,000 |