Back to bathroom remodel contractors
Oliver & Company Inc.
- Based in
- Richmond
- On San Francisco permits
- Jul 2001 to Jul 2024
- Last 24 months
- 0 permits filed
201 permits since 2000: 160 completed, 27 never finaled, 14 expired or cancelled.
Of the 27 never-finaled permits, 2 are 3 to 5 years old, 11 are 5 to 10 years old, 14 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 80 days from filing to permit and 251 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 24, 2023 | Completed final sign-off May 2024 | 741 South Van Ness Av | accessibility upgrades to an existing non-sprinklered unconditioned 2-story & mezzanine wood frame assembly building. accessibility changes at entry & platform lift and bathroom.Details
accessibility upgrades to an existing non-sprinklered unconditioned 2-story & mezzanine wood frame assembly building. accessibility changes at entry & platform lift and bathroom. | $312,000 |
| Mar 6, 2015 | Completed final sign-off Sep 2025 | 445 Geary St | barrier removal, provide da bathrooms in basement with elevator from 1st floor to basement. enlarge basement upgrade (e) stair to basement, add (n) stairs. mep sprinkler basement under separate permit. rebuild electrical room.Details
barrier removal, provide da bathrooms in basement with elevator from 1st floor to basement. enlarge basement upgrade (e) stair to basement, add (n) stairs. mep sprinkler basement under separate permit. rebuild electrical room. | $500,000 |
| Sep 28, 2009 | Completed final sign-off Jan 2010 | 2301 Mission St | revision to application 200808229871. revise details/ size of ramp, dimensions & door layout of bathroom. delete "future prof. services" office & sink. add shower and kitchenette all at 2nd floor.Details
revision to application 200808229871. revise details/ size of ramp, dimensions & door layout of bathroom. delete "future prof. services" office & sink. add shower and kitchenette all at 2nd floor. | $50,000 |
| Nov 30, 2006 | Never finaled issued Mar 2007, no final | 470 West Portal Av | intrior alterations to an existing open office utility building to convert ti to a high school. conditional use apprived under seperate permit corer and shell upgrades including all structural upgrades, windows replacement and new windows, interior and enterior stairas sramp, bathrooms and all otherDetails
intrior alterations to an existing open office utility building to convert ti to a high school. conditional use apprived under seperate permit corer and shell upgrades including all structural upgrades, windows replacement and new windows, interior and enterior stairas sramp, bathrooms and all other | $1,250,000 |
| Dec 17, 2001 | Completed final sign-off Sep 2002 | 536 Parker Av | remodel upstairs kitchen & bath;Details
remodel upstairs kitchen & bath; | $125,000 |