Olcote Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2024 to Apr 2026
- Last 24 months
- 4 permits filed
5 permits since 2000: 4 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 224 days from filing to permit and 172 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 762 29th Av | revision pa 2024-0201-5085 structural changes to proposed deck. remove window #2 from proposed scope & shear wallsDetails
revision pa 2024-0201-5085 structural changes to proposed deck. remove window #2 from proposed scope & shear walls | |
| Feb 1, 2024 | Completed final sign-off Oct 2025 | 762 29th Av | 1. enlarge existing rear deck in single family residence. 2. replace and add 2 new doors and windows in existing residence facing rear yard. 3. new shear walls at upper floor at new window location. 4. remove existing detached 20sf storage shed.Details
1. enlarge existing rear deck in single family residence. 2. replace and add 2 new doors and windows in existing residence facing rear yard. 3. new shear walls at upper floor at new window location. 4. remove existing detached 20sf storage shed. | $30,000 |