Back to bathroom remodel contractors
Ohanlon Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2024 to Jun 2026
- Last 24 months
- 6 permits filed
11 permits since 2000: 9 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 26, 2024 | Completed final sign-off Sep 2024 | 919 Grove St | bathroom remodel in kind: demolition of existing tile, re do tile, install new shower valve and tub, new vanity and toilet. no removal of wallsDetails
bathroom remodel in kind: demolition of existing tile, re do tile, install new shower valve and tub, new vanity and toilet. no removal of walls | $20,552 |
| Jun 5, 2024 | Completed final sign-off Oct 2024 | 275 Ashton Av | bathroom remodel at ground floor- like for like: changing shower valve, tiling shower walls and floors. no change to floor layout. no change to wall layout. no structural work.Details
bathroom remodel at ground floor- like for like: changing shower valve, tiling shower walls and floors. no change to floor layout. no change to wall layout. no structural work. | $18,000 |