Back to bathroom remodel contractors
Odyssey Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Oct 2017
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 446 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2016 | Completed final sign-off Dec 2017 | 834 Urbano Dr | replace 1 window at bathroom, not street facing & u factor .32; upgrade elec. panel. re-framing existing wall due to dry rot; remodel kitchen.Details
replace 1 window at bathroom, not street facing & u factor .32; upgrade elec. panel. re-framing existing wall due to dry rot; remodel kitchen. | $22,225 |