Back to kitchen remodel contractors
O'shea Co. Home Grown Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2013 to Aug 2026
- Last 24 months
- 27 permits filed
116 permits since 2000: 106 completed, 7 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 20 completed, 2 in progress, 2 expired or cancelled. Typically 6 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Aug 2026 | 1575 17th Av | revision to 202407237063: remove scope of work @ 2nd/f: new scope only include new interior stair, remove kitchen, add laundry rm, update proposed scope @ 1st/f to include in-fill south light well @ 1st/f only, update structural work @ 1st/f to lardwate w/ previously approved plan layoutDetails
revision to 202407237063: remove scope of work @ 2nd/f: new scope only include new interior stair, remove kitchen, add laundry rm, update proposed scope @ 1st/f to include in-fill south light well @ 1st/f only, update structural work @ 1st/f to lardwate w/ previously approved plan layout | |
| Jun 30, 2025 | Completed final sign-off Jun 2026 | 738 Hayes St | remodel primary bathroom & bedroom, new skylight at bath at 3rd/f. new skylight at kitchen, new on-demand hot water heater for primary bath. no work at 1st/f. no change to exterior elevationsDetails
remodel primary bathroom & bedroom, new skylight at bath at 3rd/f. new skylight at kitchen, new on-demand hot water heater for primary bath. no work at 1st/f. no change to exterior elevations | $60,000 |
| Sep 10, 2024 | In progress issued Feb 2026 | 1575 17th Av | turning 1st level garage to conditioned space w/ kitchen, half bath and living room. 2nd level is reorganized into 4 bedrooms, 3 full bath, laundry and family room. exterior new deck at 1st lvl from living room and closing off front entry stairs to be interior.Details
turning 1st level garage to conditioned space w/ kitchen, half bath and living room. 2nd level is reorganized into 4 bedrooms, 3 full bath, laundry and family room. exterior new deck at 1st lvl from living room and closing off front entry stairs to be interior. | $150,000 |
| Dec 20, 2023 | Completed final sign-off Jun 2025 | 3525 24th St | removal of (e) bearing wall between (e) kitchen & living rm, addition of (n) bathroom, and kitchen remodel at the top unit at (e) three unitDetails
removal of (e) bearing wall between (e) kitchen & living rm, addition of (n) bathroom, and kitchen remodel at the top unit at (e) three unit | $32,500 |
| Aug 8, 2023 | Completed final sign-off May 2024 | 140 Cerritos Av | kitchen remodel like for likeDetails
kitchen remodel like for like | $20,000 |
| Jul 10, 2023 | Completed final sign-off Apr 2025 | 15 Clairview Ct | garage: remodel garage & storage area to (n) bedroom, bath, laundry, living rm w/ access to rear yard. 2nd fl: remodel kitchen opening sitting area, remodel bathooms, remove fireplace, (n) windows, (n) rear deck. (n) batten screen at fornt facade, paint exterior. add 702 sf conditioned spaceDetails
garage: remodel garage & storage area to (n) bedroom, bath, laundry, living rm w/ access to rear yard. 2nd fl: remodel kitchen opening sitting area, remodel bathooms, remove fireplace, (n) windows, (n) rear deck. (n) batten screen at fornt facade, paint exterior. add 702 sf conditioned space | $215,000 |
| Jun 12, 2023 | Completed final sign-off Feb 2025 | 950 De Haro St | horizontal addition of two story enclosure and extension of kitchens in both units at rear.Details
horizontal addition of two story enclosure and extension of kitchens in both units at rear. | $49,999 |
| Mar 23, 2023 | Completed final sign-off Apr 2023 | 738 Hayes St | replace front exterior windows in=-kind. like for like. wood sahshes with lugs and insulated glass. demo (e) shower floor and install new shower pan. retile to match (e0. replace kitchen ceiling.Details
replace front exterior windows in=-kind. like for like. wood sahshes with lugs and insulated glass. demo (e) shower floor and install new shower pan. retile to match (e0. replace kitchen ceiling. | $7,400 |
| Oct 14, 2022 | Expired or cancelled cancelled Jan 2026 | 335 Monterey Bl | modifications to existing kitchen, moving 1 opening on load bearing wall, expanding or adding openings on non-load wall and moving existing powder room.Details
modifications to existing kitchen, moving 1 opening on load bearing wall, expanding or adding openings on non-load wall and moving existing powder room. | $25,000 |
| Jul 22, 2022 | Completed final sign-off Nov 2022 | 6444 Geary Bl | kitchen and bath remodel in kind no wall moved.Details
kitchen and bath remodel in kind no wall moved. | $24,000 |
| Apr 28, 2022 | Completed final sign-off Aug 2022 | 66 Hazelwood Av | kitchen remodel- non structural in kind.Details
kitchen remodel- non structural in kind. | $20,000 |
| Apr 28, 2022 | Completed final sign-off Jan 2023 | 837 Dolores St | unit #837: remodel (e) kitchen & bathroom. add half bathroom. add laundry at pantry.Details
unit #837: remodel (e) kitchen & bathroom. add half bathroom. add laundry at pantry. | $40,000 |
| Mar 11, 2022 | Completed final sign-off Dec 2022 | 1526 24th Av | revision to the pa 202109108205 enclose interior courtyard at 2nd floor renovate kitchen and add full bath.Details
revision to the pa 202109108205 enclose interior courtyard at 2nd floor renovate kitchen and add full bath. | $15,000 |
| Feb 8, 2022 | Completed final sign-off Jul 2022 | 310 Union St | remove (e) window sashes and remove bldg and install new block frame insert windows with insulated glass. 2 first floor dining; 4- 2nd floor hallway 2-2nd floor kitchen; 1 2nd floor bedroom. no change to (e) frames. regular windows (9) total u=.30maxDetails
remove (e) window sashes and remove bldg and install new block frame insert windows with insulated glass. 2 first floor dining; 4- 2nd floor hallway 2-2nd floor kitchen; 1 2nd floor bedroom. no change to (e) frames. regular windows (9) total u=.30max | $16,000 |
| Aug 25, 2021 | Completed final sign-off May 2022 | 2826 Ulloa St | addition of new post in e garage. convert e office to new bath, new 9'8" opening in wall between e kitchen and dining rm, kitchen remodelDetails
addition of new post in e garage. convert e office to new bath, new 9'8" opening in wall between e kitchen and dining rm, kitchen remodel | $50,000 |
| Feb 9, 2021 | Completed final sign-off Sep 2021 | 27 Homewood Ct | remodel (e) kitchen and 2 bathrooms. remove and replace in kind. no change in layout of walls and openings.Details
remodel (e) kitchen and 2 bathrooms. remove and replace in kind. no change in layout of walls and openings. | $50,000 |
| Feb 9, 2021 | Completed final sign-off Oct 2021 | 1319 Greenwich St | leak repair at top level kitchen ceiling and wall. remove drywall at partial ceiling and wall. water test. repair leak. patch wall and ceiling. no change to walls and layout.Details
leak repair at top level kitchen ceiling and wall. remove drywall at partial ceiling and wall. water test. repair leak. patch wall and ceiling. no change to walls and layout. | $6,000 |
| Sep 15, 2020 | Expired or cancelled cancelled Jan 2026 | 3449 Fillmore St | ground floor apartment remodel: bathroom remodel in kind; kitchen upgrade includes new countertops, appliances at existing locations; new lighting; replace rear exterior sliding glass door and rear exterior windows (2 in kind); dry rot repairat existing exterior deck. kitchen 8'x7', bathroom 5'x7'Details
ground floor apartment remodel: bathroom remodel in kind; kitchen upgrade includes new countertops, appliances at existing locations; new lighting; replace rear exterior sliding glass door and rear exterior windows (2 in kind); dry rot repairat existing exterior deck. kitchen 8'x7', bathroom 5'x7' | $25,000 |
| Aug 15, 2020 | Completed final sign-off Jun 2022 | 1853 24th Av | kitchen remodel, removal of interior light well.Details
kitchen remodel, removal of interior light well. | $62,000 |
| Sep 27, 2019 | Completed final sign-off Mar 2020 | 1635 Grove St | kitchen remodel replace 3 windows in kind. remove no walls. windows are located at rear of propertyDetails
kitchen remodel replace 3 windows in kind. remove no walls. windows are located at rear of property | $25,000 |
| Dec 20, 2018 | Completed final sign-off May 2019 | 799 Athens St | replace three single-glazed aluminum windows in kitchen with marvin wood ultimate aluminum-clad insulated windows.Details
replace three single-glazed aluminum windows in kitchen with marvin wood ultimate aluminum-clad insulated windows. | $5,000 |
| Oct 17, 2018 | Completed final sign-off May 2019 | 799 Athens St | remodel (e) kitchen & bath, open wall btwn kitchen and diningDetails
remodel (e) kitchen & bath, open wall btwn kitchen and dining | $64,000 |
| Feb 28, 2018 | Completed final sign-off Oct 2018 | 2439 35th Av | renovate kitchen and bathroom. install new skylight at kitchen. add closets in hallway and bedroom.Details
renovate kitchen and bathroom. install new skylight at kitchen. add closets in hallway and bedroom. | $50,000 |
| Mar 28, 2014 | Completed final sign-off Aug 2014 | 1015 Portola Dr | install new kitchen cabinets and new appliances. install new tile over (e) subfloor. relocate (e) gas feed for range (roughly 3 ft), finish paint.Details
install new kitchen cabinets and new appliances. install new tile over (e) subfloor. relocate (e) gas feed for range (roughly 3 ft), finish paint. | $3,500 |