Back to kitchen remodel contractors
O'pro Construction Inc.
- Based in
- Pittsburg
- On San Francisco permits
- Feb 2016 to Sep 2026
- Last 24 months
- 12 permits filed
86 permits since 2000: 77 completed, 2 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
22 kitchen remodel permits: 17 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 18 days from filing to permit and 287 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2026 | In progress issued Sep 2026 | 50 Webster St | interior remodel 1st fl. remodel e kitchen and bathroom, dining room, bedrooms. remove walls for open space and bathroom.Details
interior remodel 1st fl. remodel e kitchen and bathroom, dining room, bedrooms. remove walls for open space and bathroom. | $187,000 |
| Jan 28, 2026 | In progress issued Mar 2026 | 227 Sargent St | interior remodel partical enclosure of front entrance foyer leaving 3 feet recess; convert part of ground loor space into the 1 bedroom, living room and a bathroom total 456 sq ft 2sd floor bath/kitchen and 2 bedroom remodel.Details
interior remodel partical enclosure of front entrance foyer leaving 3 feet recess; convert part of ground loor space into the 1 bedroom, living room and a bathroom total 456 sq ft 2sd floor bath/kitchen and 2 bedroom remodel. | $80,000 |
| Jan 27, 2026 | Completed final sign-off Oct 2026 | 1696 08th Av | comply with nov #202297692: 2nd fl- total remodel- 1 kitchen & 2 baths. 1st fl- convert playroom to bedroom and 1 bath. add lower deck at rear.Details
comply with nov #202297692: 2nd fl- total remodel- 1 kitchen & 2 baths. 1st fl- convert playroom to bedroom and 1 bath. add lower deck at rear. | $120,000 |
| Jul 28, 2025 | Completed final sign-off Apr 2026 | 31 Mangels Av | interior remodel/convert part of ground/f into living space. 2nd fl kitchen wall demo & replace rear sliding door. relocate walls in the bedroom of 2nd fl. 1st fl to add new bath & laundry room. relocate walls in 1st fl.Details
interior remodel/convert part of ground/f into living space. 2nd fl kitchen wall demo & replace rear sliding door. relocate walls in the bedroom of 2nd fl. 1st fl to add new bath & laundry room. relocate walls in 1st fl. | $90,000 |
| Mar 21, 2025 | Completed final sign-off Nov 2025 | 726 Clement St | remodel 3 bathrooms and remodel kitchen. install & replace furnace inside attic. upgrade electrical new panel. no new wall & no existing wall relocation. number of plumbing fixtures remain the same. new lighting shall comply with cec 150.0 (k)3 & (k)5Details
remodel 3 bathrooms and remodel kitchen. install & replace furnace inside attic. upgrade electrical new panel. no new wall & no existing wall relocation. number of plumbing fixtures remain the same. new lighting shall comply with cec 150.0 (k)3 & (k)5 | $48,000 |
| Jan 15, 2025 | Completed final sign-off Apr 2025 | 219 De Montfort Av | remodel kitchen, 3 bathrooms same location, no layout changeDetails
remodel kitchen, 3 bathrooms same location, no layout change | $48,500 |
| Dec 20, 2024 | Completed final sign-off Nov 2025 | 726 Clement St | comply to nov# 202315250: remove wall in the 3rd floor kitchen. repair all fire damage - sister joistsDetails
comply to nov# 202315250: remove wall in the 3rd floor kitchen. repair all fire damage - sister joists | $8,000 |
| Apr 11, 2024 | Completed final sign-off Oct 2024 | 1266 Brussels St | 2nd fl: remodel kitchen, demo existing sheet rock & replace with new. add new cove molding at ceiling perimeter. replace existing flooring with new engineered hardwoodDetails
2nd fl: remodel kitchen, demo existing sheet rock & replace with new. add new cove molding at ceiling perimeter. replace existing flooring with new engineered hardwood | $50,000 |
| May 24, 2023 | Completed final sign-off Jun 2023 | 1070 Green St | remove non structuctural partition walls in kitchen areaDetails
remove non structuctural partition walls in kitchen area | $450 |
| Sep 19, 2022 | Completed final sign-off Dec 2024 | 243 Gennessee St | demolition remodel kitchen, bath drywall no modification of wall no structuralDetails
demolition remodel kitchen, bath drywall no modification of wall no structural | $25,000 |
| Nov 12, 2021 | Completed final sign-off Jul 2024 | 883 Carolina St | remodel extg sfd. nw foundation replacement. rooms down to garage level. nw bed/bathrooms. remodel 1st floor & second fl relocation of stair,kitchen, laundry & bathroom. infill light well at north and south elevations. new windows, repair deck 50%. correct story count to 3 stories.Details
remodel extg sfd. nw foundation replacement. rooms down to garage level. nw bed/bathrooms. remodel 1st floor & second fl relocation of stair,kitchen, laundry & bathroom. infill light well at north and south elevations. new windows, repair deck 50%. correct story count to 3 stories. | $200,000 |
| Oct 7, 2021 | Completed final sign-off Dec 2023 | 3841 Clement St | demolition dry wall and replace. new 5/8" type x (entire house). no walls removed. remodel one bath and one kitchen. non structural.Details
demolition dry wall and replace. new 5/8" type x (entire house). no walls removed. remodel one bath and one kitchen. non structural. | $4,500 |
| Sep 20, 2021 | Expired or cancelled expired Jul 2024 | 883 Carolina St | remodel one extg kitchen and one bath. no structural elements exploratory demo for dry rot.on the south, east, and north wall. 100sf/each wall. open sheetrock and replace sheetrock after (tot. around 300sf).Details
remodel one extg kitchen and one bath. no structural elements exploratory demo for dry rot.on the south, east, and north wall. 100sf/each wall. open sheetrock and replace sheetrock after (tot. around 300sf). | $40,000 |
| Aug 5, 2021 | Completed final sign-off Jul 2022 | 3427 25th St | 1) replace lower-level unit's kitchen cabinets, countertops, sink, & all appliances with new, & to include nw lighting, electrical outlets, ventilation fan, and plmg work. 2) re-configure lower level unit's bathroom, to include new light, electrical outlets, switches, vantilation fan, & plmg workDetails
1) replace lower-level unit's kitchen cabinets, countertops, sink, & all appliances with new, & to include nw lighting, electrical outlets, ventilation fan, and plmg work. 2) re-configure lower level unit's bathroom, to include new light, electrical outlets, switches, vantilation fan, & plmg work | $38,000 |
| Jun 25, 2021 | Completed final sign-off Mar 2025 | 2315 Sacramento St | 4th fl: reconfigure floor plan to create living, dining and kitchen & 2 full bathrooms. 3th fl: reconfigure floor plan to create living, dining and kitchen & 2 full bathrooms. infill 4 windoss and install 6 new windows.Details
4th fl: reconfigure floor plan to create living, dining and kitchen & 2 full bathrooms. 3th fl: reconfigure floor plan to create living, dining and kitchen & 2 full bathrooms. infill 4 windoss and install 6 new windows. | $150,000 |
| Mar 8, 2021 | Completed final sign-off Oct 2022 | 233 Granada Av | demolition, remodel kitchen and bath. dry wall no modification of wal no structural.Details
demolition, remodel kitchen and bath. dry wall no modification of wal no structural. | $30,000 |
| Jul 13, 2020 | Completed final sign-off Nov 2021 | 31 Prescott Ct | remodel (e) kitchen & bathroom @ each unit. remodel (e) bedrooms @ each unit.Details
remodel (e) kitchen & bathroom @ each unit. remodel (e) bedrooms @ each unit. | $80,000 |
| Dec 12, 2019 | Completed final sign-off Jan 2021 | 23 Madrid St | revision to pa 2019-1206-8968 - 1st fl - add 2 bedrm, bathrm, laundry & family rm; open stairway connect 1st & 2nd fl; remove (e) door w/window @ front; replace (e) windows & add 1 window @ front; 2nd fl - relocate (e) kitchen, dining & powder rm; 3rd fl - relocate (e) bath, add bedrm & bathrm. addDetails
revision to pa 2019-1206-8968 - 1st fl - add 2 bedrm, bathrm, laundry & family rm; open stairway connect 1st & 2nd fl; remove (e) door w/window @ front; replace (e) windows & add 1 window @ front; 2nd fl - relocate (e) kitchen, dining & powder rm; 3rd fl - relocate (e) bath, add bedrm & bathrm. add | $12,000 |
| Feb 1, 2019 | Never finaled issued May 2021, no final | 1614 Mcallister St | 1st fl - add 3 full baths, convert storage space to 3 bedrooms, study and media room///nfpa 13 system required. add a kitchen,living, and dining. additional one unit to existing 1st floor storage.Details
1st fl - add 3 full baths, convert storage space to 3 bedrooms, study and media room///nfpa 13 system required. add a kitchen,living, and dining. additional one unit to existing 1st floor storage. | $150,000 |
| Jan 16, 2019 | Completed final sign-off Nov 2019 | 1250 Jones St | unit 1402, 14th fl - demo 2 partition walls; new fixture on 2 baths; new kitchen island counter. no structural changesDetails
unit 1402, 14th fl - demo 2 partition walls; new fixture on 2 baths; new kitchen island counter. no structural changes | $250,000 |
| Aug 7, 2017 | Completed final sign-off Jun 2024 | 3841 Clement St | vertical addition. add 3rd flr w/ front setback 9'0" from facade. add 3 bdrms, 2 baths, front deck & stairs to roof. provide roof deck. 2nd flr remodel kitchen, 1 bath, add laundry. spiral to yard. 1st flr provide 2 car tandem park, remodel bedrm, office & 1 bath. add storage. provide elevator toDetails
vertical addition. add 3rd flr w/ front setback 9'0" from facade. add 3 bdrms, 2 baths, front deck & stairs to roof. provide roof deck. 2nd flr remodel kitchen, 1 bath, add laundry. spiral to yard. 1st flr provide 2 car tandem park, remodel bedrm, office & 1 bath. add storage. provide elevator to | $392,535 |
| Jul 12, 2016 | Never finaled issued Oct 2018, no final | 1614 Mcallister St | reconfigure interior layout for all 3 units. add one bedroom, one study, 3 bathrooms & 1 entertainment on 2nd. relocate kitchen on 2nd flr. add 2 bedrooms, office, 3 baths and entertainment rm & relocate kitchen on 3rd. add 2 bathrooms, study, office, gameroom, media rm, & relocate kitchenDetails
reconfigure interior layout for all 3 units. add one bedroom, one study, 3 bathrooms & 1 entertainment on 2nd. relocate kitchen on 2nd flr. add 2 bedrooms, office, 3 baths and entertainment rm & relocate kitchen on 3rd. add 2 bathrooms, study, office, gameroom, media rm, & relocate kitchen | $80,000 |