Block 1936, lot 017
1696 08th Ave
- City’s use
- Single Family Residential
- Built
- 1950
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,242 sq ft
- Lot
- 3,737 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 27, 2026 | Completed final sign-off Oct 2026 | 1696 08th Av | O'pro Construction Inc. | comply with nov #202297692: 2nd fl- total remodel- 1 kitchen & 2 baths. 1st fl- convert playroom to bedroom and 1 bath. add lower deck at rear.Details
comply with nov #202297692: 2nd fl- total remodel- 1 kitchen & 2 baths. 1st fl- convert playroom to bedroom and 1 bath. add lower deck at rear. | $120,000 |
| Oct 30, 2022 | Completed final sign-off Aug 2023 | 1696 08th Av | High Quality Roofing Co | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $9,500 |
| Oct 26, 2022 | Expired or cancelled cancelled Sep 2026 | 1696 08th Av | Mutual Seiko Construction | comply w/ nov: 202297692: repair minor fire damage in rear bedroom and hallway. no structural damage, repair bedroom window not visible from street.Details
comply w/ nov: 202297692: repair minor fire damage in rear bedroom and hallway. no structural damage, repair bedroom window not visible from street. | $5,000 |
| Jan 6, 2009 | Completed final sign-off Aug 2009 | 1696 08th Av | interior remodel of adding a new bathroom at the 1st floor play room.Details
interior remodel of adding a new bathroom at the 1st floor play room. | $4,000 | |
| Dec 26, 2008 | Completed final sign-off Jan 2009 | 1696 08th Av | replace with same, window vinyl in kitchen east wall (2), replace with same windows in bedroom east wall (1 pair 2x hung), repalce with same windows in playroom northwall (3-7,4"x22), replace kitchen cabinets only with same in same location, no windows are visable from street.Details
replace with same, window vinyl in kitchen east wall (2), replace with same windows in bedroom east wall (1 pair 2x hung), repalce with same windows in playroom northwall (3-7,4"x22), replace kitchen cabinets only with same in same location, no windows are visable from street. | $4,260 | |
| May 16, 2008 | Completed final sign-off Sep 2008 | 1696 08th Av | build rear deck 20'x13' + 9'x7', six feet off grade.Details
build rear deck 20'x13' + 9'x7', six feet off grade. | $5,000 | |
| Dec 27, 2006 | Completed final sign-off Dec 2006 | 1696 08th Av | renewal of pa# 2005/10/03/4628 to get final.Details
renewal of pa# 2005/10/03/4628 to get final. | ||
| Nov 9, 2006 | Completed final sign-off Dec 2006 | 1696 08th Av | Roof Guard Company Inc. | reroofingDetails
reroofing | $6,000 |
| Oct 3, 2005 | Expired or cancelled expired Jan 2009 | 1696 08th Av | replace dryrot windows on front of south side/repairs dryrot if any 0n front & south side/ replace wndw in kind woodDetails
replace dryrot windows on front of south side/repairs dryrot if any 0n front & south side/ replace wndw in kind wood | $4,800 | |
| Mar 22, 2004 | Expired or cancelled withdrawn May 2009 | 1696 08th Av | horizontal extension:2/f new deck & new sunroom,main floor (1/f)convert & extend playroom into aDetails
horizontal extension:2/f new deck & new sunroom,main floor (1/f)convert & extend playroom into a | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- High Quality Roofing Co, Mutual Seiko Construction, O'pro Construction Inc., Roof Guard Company Inc.
- Engineers
- Lawrence Liao
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.