O'driscoll Plastering
- Based in
- San Francisco
- On San Francisco permits
- Apr 2022 to Jun 2022
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2022 | Completed final sign-off Jul 2022 | 2334 48th Av | replace stucco in-kind at front. approx 300 sqft.Details
replace stucco in-kind at front. approx 300 sqft. | $16,500 |
| Apr 11, 2022 | Completed final sign-off Apr 2022 | 3336 Quintara St | interior: remove 5ft max 2x4 vertical stud in left side room-replace in kind.install sheet rock in left & right front rooms. plaster walls. exterior remove exisitng stucco underneath window approx. 40 sqft to exisitng vent. remove old vent & install new. apply water membranes. attach new wire stuccoDetails
interior: remove 5ft max 2x4 vertical stud in left side room-replace in kind.install sheet rock in left & right front rooms. plaster walls. exterior remove exisitng stucco underneath window approx. 40 sqft to exisitng vent. remove old vent & install new. apply water membranes. attach new wire stucco | $11,700 |