O'dowd Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jun 2011
- Last 24 months
- 0 permits filed
7 permits since 2000: 4 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 20, 2011 | Completed final sign-off Sep 2011 | 3779 25th St | revision to permit 201105276967; remove existing cracked and degrated conc slab in basement storage area and replace with new conc. slab, (n) conc slab, 3-1/2" thk w/6x6 mesh,6 mil polypropylene,abt 10 ft wide by 30 ft deepDetails
revision to permit 201105276967; remove existing cracked and degrated conc slab in basement storage area and replace with new conc. slab, (n) conc slab, 3-1/2" thk w/6x6 mesh,6 mil polypropylene,abt 10 ft wide by 30 ft deep | $1,500 |
| May 27, 2011 | Completed final sign-off Sep 2011 | 3779 25th St | moisture condition in basement. remove surface carpet and apply waterproofing concrete layer over the existing slab. possiblly use xypax concrete.Details
moisture condition in basement. remove surface carpet and apply waterproofing concrete layer over the existing slab. possiblly use xypax concrete. | $2,500 |
| Jan 20, 2011 | Completed final sign-off Mar 2011 | 3779 25th St | repair/replace minor damage due to rot @ rear deck, (less than 50% repair)Details
repair/replace minor damage due to rot @ rear deck, (less than 50% repair) | $2,000 |
| Aug 9, 2000 | Expired or cancelled expired Oct 2001 | 245 Scott St | renew existing permit 200000016357Details
renew existing permit 200000016357 | $2,000 |
| Aug 9, 2000 | Completed final sign-off Aug 2000 | 35 Vienna St | replace 4 concreye piers in basement , install plywood at interior perimeterDetails
replace 4 concreye piers in basement , install plywood at interior perimeter | $500 |
| Mar 9, 2000 | Expired or cancelled expired Sep 2000 | 35 Vienna St | termite repairDetails
termite repair | |
| Jan 6, 2000 | Expired or cancelled expired Oct 2001 | 245 Scott St | renew expired appl #9908877Details
renew expired appl #9908877 |