Nova Designs Builds Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Jul 2026
- Last 24 months
- 9 permits filed
269 permits since 2000: 201 completed, 4 in progress, 26 never finaled, 38 expired or cancelled.
Of the 26 never-finaled permits, 3 are 5 to 10 years old, 23 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
21 deck permits: 16 completed, 3 never finaled, 2 expired or cancelled. Typically 10 days from filing to permit and 247 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2023 | Completed final sign-off Mar 2026 | 1171 Capitol Av | comply with nov 202301350. create new 1 bedroom adu unit on ground floor at rear of existing garage. add new deck 30" above grade to access rear yard.Details
comply with nov 202301350. create new 1 bedroom adu unit on ground floor at rear of existing garage. add new deck 30" above grade to access rear yard. | $50,000 |
| Oct 11, 2022 | Completed final sign-off Jun 2023 | 675 23rd Av | add 435 sqft living space at 1st floor in garage + infill below 2 story at rear - add rear deck + stairs to yard - remodel kitchen + powder rm - add (1) bathroom + laundry closet at 3rd floor. kitchen, pwder rm & (e) bathroom covered under ref pa# 202209021811.Details
add 435 sqft living space at 1st floor in garage + infill below 2 story at rear - add rear deck + stairs to yard - remodel kitchen + powder rm - add (1) bathroom + laundry closet at 3rd floor. kitchen, pwder rm & (e) bathroom covered under ref pa# 202209021811. | $150,000 |
| Jul 7, 2017 | Completed final sign-off Aug 2020 | 2551 Greenwich St | revision to pa #201312063534 - revise to type 5a construction & 13r nfpa sprinkler. add dumbwaiter in lightwell, demo property line window, partial rear deck demo, new rear window sizes, remove skylight.Details
revision to pa #201312063534 - revise to type 5a construction & 13r nfpa sprinkler. add dumbwaiter in lightwell, demo property line window, partial rear deck demo, new rear window sizes, remove skylight. | |
| Mar 16, 2015 | Expired or cancelled expired Feb 2025 | 23 Wood St | revision to appn #200207252319 to affect repair per correction notices issued by district inspector. remodel (e) units add elevator, add roof deck infill 4th floor deck, horriz. extension at street side of 4th floorDetails
revision to appn #200207252319 to affect repair per correction notices issued by district inspector. remodel (e) units add elevator, add roof deck infill 4th floor deck, horriz. extension at street side of 4th floor | $50,000 |
| Jul 25, 2013 | Completed final sign-off Feb 2016 | 2250 Vallejo St | revise main stairs, add stair & elevator. convert roof to deck, revise windows. ref 2012-11-09-3896, 2013-05-29-8063 dpw 13ie0099. no basement level - make type i ground level (see ab-005).Details
revise main stairs, add stair & elevator. convert roof to deck, revise windows. ref 2012-11-09-3896, 2013-05-29-8063 dpw 13ie0099. no basement level - make type i ground level (see ab-005). | $250,000 |
| Dec 12, 2011 | Completed final sign-off May 2014 | 776 27th St | horizontal addition @ rear:add family room at basement, add bathroom, add rec room, add wetbar, add stairs to 1st flr. 1st flr: enlarge master bedroom and office. add stairs to 2nd flr. 2nd flr: enlarge living room, relocate dining room add deck.Details
horizontal addition @ rear:add family room at basement, add bathroom, add rec room, add wetbar, add stairs to 1st flr. 1st flr: enlarge master bedroom and office. add stairs to 2nd flr. 2nd flr: enlarge living room, relocate dining room add deck. | $150,000 |
| Apr 15, 2011 | Completed final sign-off Nov 2011 | 620 Euclid Av | revision to pa#200710256504: remove approved conservatory from scope of work-replace with deck above garage w/ guardrail.Details
revision to pa#200710256504: remove approved conservatory from scope of work-replace with deck above garage w/ guardrail. | |
| Sep 21, 2010 | Completed final sign-off Jun 2011 | 2 Everson St | deck infill @ 1st. flr. revise master suite layout, add 1 bath @ 2nd. flr. revise kitchen plan, revision to appl.#200505233166.Details
deck infill @ 1st. flr. revise master suite layout, add 1 bath @ 2nd. flr. revise kitchen plan, revision to appl.#200505233166. | $50,000 |
| Sep 24, 2009 | Completed final sign-off Aug 2012 | 943 Steiner St | remove stainglass window at south side wall. 2nd floor-change french doors to 2 dh windows at 2nd floor rear deck. remove & build rear deck to comply with physical inspection cc-5544Details
remove stainglass window at south side wall. 2nd floor-change french doors to 2 dh windows at 2nd floor rear deck. remove & build rear deck to comply with physical inspection cc-5544 | $15,000 |
| Oct 22, 2008 | Completed final sign-off Jun 2009 | 75 Coleridge St | no structural changes-remodel baths, (4) kitchen (2) and interior finishes, replace post @ deck (dryrot) comply w/nov 08/18/08. repair or replace damaged sash same size + style location repair ext. dryrot on siding. exteiror work at front of building. to comply w/nov dated;08/25/03.Details
no structural changes-remodel baths, (4) kitchen (2) and interior finishes, replace post @ deck (dryrot) comply w/nov 08/18/08. repair or replace damaged sash same size + style location repair ext. dryrot on siding. exteiror work at front of building. to comply w/nov dated;08/25/03. | $100,000 |
| Aug 22, 2008 | Completed final sign-off Nov 2010 | 1813 Greenwich St | 2 story addition/establish single family occupancy: 1st fl remodel garage, relocate entry,stairs,add elevator, storage rms. 2nd fl remodel,4 bedrooms, 3 baths, 1 alaundry, 1 front deck. 3rd fl new story,front deck, liv rm,din rm,fam rm,kitchen,1/2 bath,rear deck.4th fl 1 story 1/2 bath, deckDetails
2 story addition/establish single family occupancy: 1st fl remodel garage, relocate entry,stairs,add elevator, storage rms. 2nd fl remodel,4 bedrooms, 3 baths, 1 alaundry, 1 front deck. 3rd fl new story,front deck, liv rm,din rm,fam rm,kitchen,1/2 bath,rear deck.4th fl 1 story 1/2 bath, deck | $720,000 |
| Jul 11, 2008 | Completed final sign-off May 2009 | 2438 Filbert St | 1st fl.lower (e) slab by 6", add 2 full baths, add 1 bedroom & 1 playroom. 2nd fl.add stairs to 1st floor, create (n) opening to living room. 3rd fl.remodel 2 (e) bathrooms, remodel master bathrm & master closet & add (n) rear deck @ kitchen, deck to be 9'-0"above (e) grade.Details
1st fl.lower (e) slab by 6", add 2 full baths, add 1 bedroom & 1 playroom. 2nd fl.add stairs to 1st floor, create (n) opening to living room. 3rd fl.remodel 2 (e) bathrooms, remodel master bathrm & master closet & add (n) rear deck @ kitchen, deck to be 9'-0"above (e) grade. | $195,000 |
| Sep 25, 2007 | Expired or cancelled expired Aug 2008 | 2828 Greenwich St | 2/f- add 1 property line window @ unit #1 as per ab-09, remove roofing & 3/f (e) deck, re-roof 3/f & 4/f, install (n) 42" railing. repalce wood pallets.Details
2/f- add 1 property line window @ unit #1 as per ab-09, remove roofing & 3/f (e) deck, re-roof 3/f & 4/f, install (n) 42" railing. repalce wood pallets. | $15,000 |
| Aug 15, 2007 | Never finaled filed Aug 2007, never issued | 22 Napier Ln | deck infill @ lower floor under existing two story deckDetails
deck infill @ lower floor under existing two story deck | $5,000 |
| Jun 7, 2006 | Completed final sign-off Dec 2006 | 1307 Bay St | work @ unit# 5 only. install new glass guardrail @ 4th floor deck, replace (e) tiled ridge with new ipe wood cap, install new ipe siding on parapet wall.Details
work @ unit# 5 only. install new glass guardrail @ 4th floor deck, replace (e) tiled ridge with new ipe wood cap, install new ipe siding on parapet wall. | $8,000 |
| Mar 3, 2005 | Completed final sign-off Aug 2005 | 2734 Buchanan St | rear elevation revision.change of material @roof deck & rear deck as per agreement with neighborsDetails
rear elevation revision.change of material @roof deck & rear deck as per agreement with neighbors | |
| Jun 11, 2004 | Never finaled issued Jun 2004, no final | 1225 Clayton St | new deck at rear yardDetails
new deck at rear yard | $3,000 |
| Jan 12, 2004 | Completed final sign-off Mar 2004 | 611 Peralta Av | replace in kind dryrot header @ sliding door to deck,reinstall flashing @ door.resheetrock ceilingDetails
replace in kind dryrot header @ sliding door to deck,reinstall flashing @ door.resheetrock ceiling | $1,000 |
| Oct 9, 2003 | Completed final sign-off Apr 2004 | 2712 California St | remove (e)wet bar in patio/open space area; repl (e)deck & stairs- remove (e)decking per planDetails
remove (e)wet bar in patio/open space area; repl (e)deck & stairs- remove (e)decking per plan | $20,000 |
| May 8, 2003 | Never finaled issued Aug 2003, no final | 1269 Vallejo St | retain (e) sunroom on 2nd floor and install larger deck over roofDetails
retain (e) sunroom on 2nd floor and install larger deck over roof | |
| Jan 15, 2003 | Completed final sign-off Aug 2003 | 670 Duncan St | add family rm plus bathrm & closet & entry hall at 1st flr, add deck, remove (e) walls at 2nd flr, rDetails
add family rm plus bathrm & closet & entry hall at 1st flr, add deck, remove (e) walls at 2nd flr, r | $90,000 |