Back to bathroom remodel contractors
Northpoint Builders
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jul 2026
- Last 24 months
- 16 permits filed
154 permits since 2000: 109 completed, 3 in progress, 18 never finaled, 24 expired or cancelled.
Of the 18 never-finaled permits, 6 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
48 bathroom remodel permits: 35 completed, 6 never finaled, 7 expired or cancelled. Typically 0 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2026 | Completed final sign-off Jun 2026 | 410 Precita Av | move existing laundry and build 3/4 bathroom in laundry room area. approx 4' x 7' area.Details
move existing laundry and build 3/4 bathroom in laundry room area. approx 4' x 7' area. | $10,000 |
| Feb 21, 2025 | Completed final sign-off Aug 2025 | 49 Nordhoff St | upstairs bathroom remodel(main floor). replace tub, toilet, add vanity. new tile floors and walls. no removal of wallsDetails
upstairs bathroom remodel(main floor). replace tub, toilet, add vanity. new tile floors and walls. no removal of walls | $17,000 |
| Aug 5, 2024 | Completed final sign-off Dec 2024 | 326 Montcalm St | convert e) laundy room at ground fl to full bath. no new framing or walls. replace furnance at ground fl to hanging position. remove tank water heater and replace w/outdoor tanklessDetails
convert e) laundy room at ground fl to full bath. no new framing or walls. replace furnance at ground fl to hanging position. remove tank water heater and replace w/outdoor tankless | $30,000 |
| May 15, 2024 | Completed final sign-off Jul 2024 | 2539 18th Av | remove walk in bathtub and separate shower and replace with bathtub and shelving. replace vanity (24") and toilet. upstairs bathroom only.Details
remove walk in bathtub and separate shower and replace with bathtub and shelving. replace vanity (24") and toilet. upstairs bathroom only. | $8,000 |
| Mar 15, 2024 | Completed final sign-off Apr 2026 | 49 Nordhoff St | add new room and bathroom at ground floor.Details
add new room and bathroom at ground floor. | $75,000 |
| Dec 11, 2023 | Completed final sign-off Jan 2024 | 23 Delmar St | make openings in ceilings and walls for electrical work. change bathroom medicine cabinet, misc. interior trim i.e. door casings and sideboards.Details
make openings in ceilings and walls for electrical work. change bathroom medicine cabinet, misc. interior trim i.e. door casings and sideboards. | $4,000 |
| Aug 30, 2022 | Completed final sign-off Oct 2023 | 200 Judson Av | comply w/ nov 201981731, 201972066, 202288444. create family rm & bath at (e) grd lv. storage area. comply w/ nov 201544171 illegal unit & 201888991. open wall at kitchen, new stair down to grd lv. reaplce partial foundation. see nov 201526411 comply - remove stairs. comply w/ nov 201889041Details
comply w/ nov 201981731, 201972066, 202288444. create family rm & bath at (e) grd lv. storage area. comply w/ nov 201544171 illegal unit & 201888991. open wall at kitchen, new stair down to grd lv. reaplce partial foundation. see nov 201526411 comply - remove stairs. comply w/ nov 201889041 | $70,000 |
| Aug 1, 2022 | Expired or cancelled cancelled Nov 2023 | 200 Judson Av | kitchen and bathroom remodel 1- remodel full gut , replace all exterior front windows in kind wood, 1 patio door and rear vinyl. replace in existing openings, u-factor 0.30. wood awning or fixed (front). dh, dh, dh awning or fixed (side).comply with nov202288334,201973421,202288444.Details
kitchen and bathroom remodel 1- remodel full gut , replace all exterior front windows in kind wood, 1 patio door and rear vinyl. replace in existing openings, u-factor 0.30. wood awning or fixed (front). dh, dh, dh awning or fixed (side).comply with nov202288334,201973421,202288444. | $40,000 |
| Jul 5, 2022 | Completed final sign-off Jan 2024 | 667 Campbell Av | remove wall between (e) kithcen and (e) living room add bean @ (e) bonus room @ lower level modify (e) lower level bonus rm bath relocate (e) laundry.Details
remove wall between (e) kithcen and (e) living room add bean @ (e) bonus room @ lower level modify (e) lower level bonus rm bath relocate (e) laundry. | $65,000 |
| Apr 18, 2022 | Completed final sign-off May 2022 | 1418 Alemany Bl | comply w/ nov 202289117. legalize (e) room and bath @ lower level rear area behind garage.Details
comply w/ nov 202289117. legalize (e) room and bath @ lower level rear area behind garage. | $10,000 |
| Jan 25, 2022 | Completed final sign-off Jan 2022 | 80 Prentiss St | to renew expired bpa#201906133378 for final inspection, kitchen & bath remodel: to obtain final inspection for work approved under pa# 201906133378.Details
to renew expired bpa#201906133378 for final inspection, kitchen & bath remodel: to obtain final inspection for work approved under pa# 201906133378. | |
| Nov 12, 2021 | Completed final sign-off Mar 2022 | 1418 Alemany Bl | (1) kitchen remodel (full qut)(1) bathroom remodel (full qut) misc drywall repairs 500 sqft. new electrical service and furance. layout to remain the same.Details
(1) kitchen remodel (full qut)(1) bathroom remodel (full qut) misc drywall repairs 500 sqft. new electrical service and furance. layout to remain the same. | $45,000 |
| Oct 25, 2021 | Completed final sign-off Dec 2021 | 645 Euclid Av | unit# 2. remodel 2 bathrooms (3 piece). no change to fixture locations. remodel 1 kitchen. non structural.Details
unit# 2. remodel 2 bathrooms (3 piece). no change to fixture locations. remodel 1 kitchen. non structural. | $45,000 |
| Jun 3, 2021 | Completed final sign-off Aug 2021 | 1462 Hayes St | unit b: dryrot and drywall repairs at skylights, kitchen and deck areas. replace kitchen and bath faucets. replace flooring @ kitchen/dining. replace electgrical panel circuitbreakers. add new refer outlet. replace 3 windows @ lightwells. install deck membrane.Details
unit b: dryrot and drywall repairs at skylights, kitchen and deck areas. replace kitchen and bath faucets. replace flooring @ kitchen/dining. replace electgrical panel circuitbreakers. add new refer outlet. replace 3 windows @ lightwells. install deck membrane. | $10,000 |
| Feb 13, 2021 | Completed final sign-off Oct 2024 | 157 Ellsworth St | addition of appox 253 sq ft of liv space to (e) home. remodel 1 bedrm, 2 baths and kitchen. remove (e) fireplace, add 2 skylights, add 1 deck and balcony.Details
addition of appox 253 sq ft of liv space to (e) home. remodel 1 bedrm, 2 baths and kitchen. remove (e) fireplace, add 2 skylights, add 1 deck and balcony. | $150,000 |
| Jan 11, 2021 | Expired or cancelled cancelled Jan 2026 | 65 Amber Dr | bathroom remodeling at master bath. add 3 skylights. loft at living.Details
bathroom remodeling at master bath. add 3 skylights. loft at living. | $28,000 |
| Sep 4, 2020 | Never finaled issued Sep 2020, no final | 65 Amber Dr | kitchen remodel in kind. replace cabinets, counters, and appliances. bathroom remodel in kind. replace fixtures and tile. main bath off entry hallway.Details
kitchen remodel in kind. replace cabinets, counters, and appliances. bathroom remodel in kind. replace fixtures and tile. main bath off entry hallway. | $40,000 |
| Aug 31, 2020 | Expired or cancelled expired Dec 2024 | 80 Prentiss St | add spiral stair to connect ground and upper level. add garage area to living space. remodel ground floor bath 6'x8'.Details
add spiral stair to connect ground and upper level. add garage area to living space. remodel ground floor bath 6'x8'. | $75,000 |
| Jul 21, 2020 | Completed final sign-off Nov 2020 | 1592 Golden Gate Av | kitchen remodel 12x14'. 2 full bath remodel 1 @ 8'x8' 1 @ 5'x8'. 1.5 baht remodel 1 @ 5'x6' all work on 2nd flr(upper unit)Details
kitchen remodel 12x14'. 2 full bath remodel 1 @ 8'x8' 1 @ 5'x8'. 1.5 baht remodel 1 @ 5'x6' all work on 2nd flr(upper unit) | $35,000 |
| May 28, 2020 | Completed final sign-off Oct 2020 | 315 Franconia St | kitchen remodel apx 80 sq ft - replace countertops and appliances. bathroom remodel apx 50 sq ft - replace vanity, fixtures, tile. kitchen & bathroom remodel in-kind.Details
kitchen remodel apx 80 sq ft - replace countertops and appliances. bathroom remodel apx 50 sq ft - replace vanity, fixtures, tile. kitchen & bathroom remodel in-kind. | $20,000 |
| Feb 11, 2020 | Completed final sign-off Apr 2020 | 321 Monticello St | kitchen remodel and replace bathroom vanity cabinet. replace cabinets and countertopDetails
kitchen remodel and replace bathroom vanity cabinet. replace cabinets and countertop | $18,000 |
| Dec 13, 2019 | Completed final sign-off Jan 2020 | 1325 Cortland Av | replace kitchen countertops and appliances. sink and faucet. replace 1 bath vanity and faucet, in kind replacementDetails
replace kitchen countertops and appliances. sink and faucet. replace 1 bath vanity and faucet, in kind replacement | $10,000 |
| Jun 13, 2019 | Expired or cancelled expired Jan 2022 | 80 Prentiss St | remodel bathrooms (2). replace tub w/ shower upstairs 6 x 10 ft. kitchen cabinet cabinet replacement upstairs, misc. window & door trim replacement. no walls removed. downstairs bath 5 x 8 ftDetails
remodel bathrooms (2). replace tub w/ shower upstairs 6 x 10 ft. kitchen cabinet cabinet replacement upstairs, misc. window & door trim replacement. no walls removed. downstairs bath 5 x 8 ft | $35,000 |
| Jun 28, 2018 | Completed final sign-off Jun 2019 | 1925 15th St | bathroom remodel. new shower pan, tiles, valve, replace vanity/lavatory sink.Details
bathroom remodel. new shower pan, tiles, valve, replace vanity/lavatory sink. | $10,000 |
| Apr 30, 2018 | Completed final sign-off Apr 2019 | 2233 09th Av | top floor bathroom remodel, replace tub in kind, lavatory and toilet. provide for laundry stack unit. new electrical circuits for fan/laundry etc. no structural work. no alteration of wall. window and door.Details
top floor bathroom remodel, replace tub in kind, lavatory and toilet. provide for laundry stack unit. new electrical circuits for fan/laundry etc. no structural work. no alteration of wall. window and door. | $15,000 |
| Mar 7, 2018 | Completed final sign-off Nov 2019 | 276 Ripley St | rev app# 201412093391 under construction flip ground fl. bath and utility room. excavate and finish 60 sq ft on ground fl. change entry staircase, add pitch to roof framing, window placement, as built changes noted on a0-0, 1st page of plans. no change in footprint or height.Details
rev app# 201412093391 under construction flip ground fl. bath and utility room. excavate and finish 60 sq ft on ground fl. change entry staircase, add pitch to roof framing, window placement, as built changes noted on a0-0, 1st page of plans. no change in footprint or height. | $17,000 |
| Oct 20, 2017 | Completed final sign-off Apr 2018 | 7 Broderick St | kitchen remodel - relocate island & lighting, replace cabinet door fronts, bathrooms remodel - replace tub w/shower t 2nd floor bath. retile 2 other bathrooms. no change on walls.Details
kitchen remodel - relocate island & lighting, replace cabinet door fronts, bathrooms remodel - replace tub w/shower t 2nd floor bath. retile 2 other bathrooms. no change on walls. | $35,000 |
| Sep 21, 2017 | Completed final sign-off Jan 2018 | 1117 Alabama St | bathroom remodel. replace tub w shower. new valve, tile, vanity, toilet. replace bath and light. replace 2 e windows facing yardDetails
bathroom remodel. replace tub w shower. new valve, tile, vanity, toilet. replace bath and light. replace 2 e windows facing yard | $5,000 |
| Jul 14, 2016 | Never finaled issued Jul 2016, no final | 268 Ripley St | kitchen remodel, add a bathroom and closet/relocate laundry. replace interior stair to meet code, remove fireplace & chimney, (e) bath remodel. no exterior work.Details
kitchen remodel, add a bathroom and closet/relocate laundry. replace interior stair to meet code, remove fireplace & chimney, (e) bath remodel. no exterior work. | $30,000 |
| Dec 9, 2014 | Completed final sign-off Nov 2019 | 276 Ripley St | remodel of (e) single family dwelling & addition @ rear w/ 1-kitchen & 2 1/2-bathroom (existing 1 1/2-bathrooms)Details
remodel of (e) single family dwelling & addition @ rear w/ 1-kitchen & 2 1/2-bathroom (existing 1 1/2-bathrooms) | $350,000 |
| Sep 9, 2014 | Completed final sign-off Mar 2015 | 4717 18th St | rear building - residential remodel - lower level: remodel e bedroom and bath for 1 bedroom, full bath, and office. upper level: remodel kitchen and bath.Details
rear building - residential remodel - lower level: remodel e bedroom and bath for 1 bedroom, full bath, and office. upper level: remodel kitchen and bath. | $75,000 |
| Jun 23, 2014 | Never finaled issued Jun 2014, no final | 4719 18th St | interior kitchen and bathroom remodel (residential); partially reconfigure some walls and closets; replace fixtures and cabinets, all interior workDetails
interior kitchen and bathroom remodel (residential); partially reconfigure some walls and closets; replace fixtures and cabinets, all interior work | $25,000 |
| May 22, 2014 | Expired or cancelled expired Sep 2022 | 2331 19th St | res'd remodel. 1st fl: new stair & reconfigure closets. proposed 2nd fl at the rear: a master bedroom with a closet, a bathroom and a deck.Details
res'd remodel. 1st fl: new stair & reconfigure closets. proposed 2nd fl at the rear: a master bedroom with a closet, a bathroom and a deck. | $200,000 |
| Apr 18, 2014 | Never finaled issued Apr 2014, no final | 120 San Jose Av | install kitchen cabinets and countertops in extg kitchen area at 1st floor. replace lavatory and toilet at bathroom.Details
install kitchen cabinets and countertops in extg kitchen area at 1st floor. replace lavatory and toilet at bathroom. | $18,000 |
| Mar 14, 2014 | Completed final sign-off Nov 2016 | 1188 Noe St | horizontal & vertical extension.1/fl-rear expansion convert kitchen,bedroom&office into a grt room w/kitchen,sitting&dinning areas.frt area remains as is.(n)2/fl-a stairway leads to 2 bedrooms(frt),a bathrm,laundry closet& a mstr bedrm(back) w/ bath, closet and a small back deck.Details
horizontal & vertical extension.1/fl-rear expansion convert kitchen,bedroom&office into a grt room w/kitchen,sitting&dinning areas.frt area remains as is.(n)2/fl-a stairway leads to 2 bedrooms(frt),a bathrm,laundry closet& a mstr bedrm(back) w/ bath, closet and a small back deck. | $600,000 |
| Aug 30, 2013 | Completed final sign-off Jan 2014 | 1117 Alabama St | rear bathroom remodel, replace shower, toilet and lavatory. install tile, lighting, etc. replace rear yard facing window.Details
rear bathroom remodel, replace shower, toilet and lavatory. install tile, lighting, etc. replace rear yard facing window. | $8,000 |
| May 13, 2013 | Completed final sign-off Dec 2015 | 560 Rhode Island St | remodel of 2-story residence, finish existing unfinished basement & garage (a.g.p. 4'9"),new garage door,new front door/entry - add 3 bathrooms remodel kitchen. rebuild existing sunroom 3' from property lines. excavate & build conforming extension under sunroom.repave driveway & tile front stairsDetails
remodel of 2-story residence, finish existing unfinished basement & garage (a.g.p. 4'9"),new garage door,new front door/entry - add 3 bathrooms remodel kitchen. rebuild existing sunroom 3' from property lines. excavate & build conforming extension under sunroom.repave driveway & tile front stairs | $355,000 |
| Nov 21, 2012 | Completed final sign-off Oct 2013 | 2771 Bryant St | replace (e) deck within (e) footprint. add new stairs to rear yard. replace window sash at rear bathroomDetails
replace (e) deck within (e) footprint. add new stairs to rear yard. replace window sash at rear bathroom | $13,000 |
| Apr 18, 2012 | Completed final sign-off Jun 2012 | 174 Ralston St | replace kitchen and bath cabinets, toilet & sink.Details
replace kitchen and bath cabinets, toilet & sink. | $12,000 |
| Dec 22, 2011 | Completed final sign-off May 2013 | 1121 Alabama St | residential remodel. 3'-2" horizontal addition @ rear w/new deck & stair to rear yard. relocate interior stair to second story unit. remodel bathrooms & kitchens in upper & lower units.Details
residential remodel. 3'-2" horizontal addition @ rear w/new deck & stair to rear yard. relocate interior stair to second story unit. remodel bathrooms & kitchens in upper & lower units. | $250,000 |
| Feb 16, 2011 | Completed final sign-off Nov 2011 | 652 Shotwell St | add new bathroom at 1st fl utility area. replace foundation at rear of bldg. re,odel (e) bath, replace windows at bathrms. (n0 decking and stairs less than 30" above grade at rear. raise fl lvl at utility area to match kitch. remove shed at rearDetails
add new bathroom at 1st fl utility area. replace foundation at rear of bldg. re,odel (e) bath, replace windows at bathrms. (n0 decking and stairs less than 30" above grade at rear. raise fl lvl at utility area to match kitch. remove shed at rear | $20,000 |
| Jul 20, 2009 | Completed final sign-off Feb 2010 | 2806 21st St | revision to 200808280338. relocate bath on 2nd. flr., revise window openings 2nd. flr.-relocate laundry on 1st. flr. no change to envelope.Details
revision to 200808280338. relocate bath on 2nd. flr., revise window openings 2nd. flr.-relocate laundry on 1st. flr. no change to envelope. | |
| Mar 9, 2009 | Completed final sign-off Mar 2010 | 120 San Jose Av | replace downstairs bath tub/repair dry rot as necessary, install new bath surround, replace damaged bathroom door, retile 3 side tub walls, work on #120aDetails
replace downstairs bath tub/repair dry rot as necessary, install new bath surround, replace damaged bathroom door, retile 3 side tub walls, work on #120a | $2,250 |
| Feb 12, 2007 | Expired or cancelled cancelled Aug 2022 | 327 Linden St | comply with nov# 200671253-new windows, remodel 2nd & 3rd floor, 2 kitchens & 2 bathrooms. new furnaces, changing window sizes in lightwell.Details
comply with nov# 200671253-new windows, remodel 2nd & 3rd floor, 2 kitchens & 2 bathrooms. new furnaces, changing window sizes in lightwell. | $32,000 |
| Feb 12, 2007 | Completed final sign-off Feb 2007 | 327 Linden St | comply with nov 200671253, new windows. remodel 2nd and 3rd floor: 2 kitchens, 2 baths. n furnaces. change window sizes in lightwell.Details
comply with nov 200671253, new windows. remodel 2nd and 3rd floor: 2 kitchens, 2 baths. n furnaces. change window sizes in lightwell. | $20,000 |
| Sep 1, 2005 | Never finaled issued Sep 2005, no final | 4431 20th St | add 3/4 bathroom @ existing closet center bedroom remove 2 brick chimneys @ lv.room and kitchen. cDetails
add 3/4 bathroom @ existing closet center bedroom remove 2 brick chimneys @ lv.room and kitchen. c | $20,000 |
| Aug 16, 2005 | Never finaled issued Aug 2005, no final | 4431 20th St | interior bathroom remodelling / rearrange fixturesDetails
interior bathroom remodelling / rearrange fixtures | $2,500 |
| Jan 5, 2001 | Expired or cancelled expired Jan 2002 | 1166 Page St | remodel & relocate kitchen and bathrms, (n) 3/4 bath additions, no structural changesDetails
remodel & relocate kitchen and bathrms, (n) 3/4 bath additions, no structural changes | $30,000 |