Back to bathroom remodel contractors
North Valley Construction Framing Inc
- Based in
- Hayward
- On San Francisco permits
- May 2019 to Mar 2024
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 119 days from filing to permit and 422 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2024 | In progress issued Mar 2024 | 1363 Grant Av | renovation of unit's 1 and 4: new kitchen cabinets, renovations of bathrooms, texture, paint and flooring. (2) kitchen remodel in-kind. (2) bathroom remodel in-kind. no moving walls, no layout changes.Details
renovation of unit's 1 and 4: new kitchen cabinets, renovations of bathrooms, texture, paint and flooring. (2) kitchen remodel in-kind. (2) bathroom remodel in-kind. no moving walls, no layout changes. | $120,000 |
| Jan 8, 2021 | Completed final sign-off Apr 2022 | 3045 Jackson St | to comply with nov202068191. rev to pa202011168951: bathroom refresh to 2 bathrooms. open wall between kitchen and living room additional 3lf. open wall between living room and hallway 1lf. add walk-in closet to bedroom.Details
to comply with nov202068191. rev to pa202011168951: bathroom refresh to 2 bathrooms. open wall between kitchen and living room additional 3lf. open wall between living room and hallway 1lf. add walk-in closet to bedroom. | $20,000 |
| Nov 16, 2020 | Completed final sign-off Apr 2022 | 3045 Jackson St | bathroom refresh (new flooring, tile, vanity, toliet and mirror electrical panel upgradeDetails
bathroom refresh (new flooring, tile, vanity, toliet and mirror electrical panel upgrade | $13,500 |
| Mar 10, 2020 | Completed final sign-off Mar 2021 | 1741 15th Av | water damage repairs installation of insulation drywall, replacement of lights, installation of new kitchen & bathroom cabinets. installation of tile floor, new doors, trim and paintDetails
water damage repairs installation of insulation drywall, replacement of lights, installation of new kitchen & bathroom cabinets. installation of tile floor, new doors, trim and paint | $129,420 |
| Dec 31, 2019 | Completed final sign-off Sep 2024 | 1701 15th Av | remodel top floors.kitchen remodel, baths eliminate front patio at 3rd fl. keep e decks and install new guard rails, residing entire houseDetails
remodel top floors.kitchen remodel, baths eliminate front patio at 3rd fl. keep e decks and install new guard rails, residing entire house | $150,000 |