North Point Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Apr 2024
- Last 24 months
- 0 permits filed
58 permits since 2000: 33 completed, 2 in progress, 4 never finaled, 19 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 28 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2012 | Completed final sign-off Jun 2012 | 35 Morse St | replace 500 sq.ft. of siding, replace less than 50% of rear deck, replace 5 windows, 3 doors, all work at back of bldg. all replacment in kind material, remodel 1 existing 1/f bath, dryrot repair less than 50%.Details
replace 500 sq.ft. of siding, replace less than 50% of rear deck, replace 5 windows, 3 doors, all work at back of bldg. all replacment in kind material, remodel 1 existing 1/f bath, dryrot repair less than 50%. | $8,000 |
| Dec 4, 2001 | Expired or cancelled expired Jan 2003 | 201 Downey St | demolition to remove rear deck stair, nov 200117083-no penalty feeDetails
demolition to remove rear deck stair, nov 200117083-no penalty fee | $1,000 |