North Coast Electric And Construction In
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Dec 2022
- Last 24 months
- 0 permits filed
18 permits since 2000: 11 completed, 7 never finaled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2022 | Never finaled issued Sep 2023, no final | 11 Bright St | major renovatio w/new restrooms, stairs, elevator installation. replace some (e) bearing walls w/beams.Details
major renovatio w/new restrooms, stairs, elevator installation. replace some (e) bearing walls w/beams. | $1,200,000 |
| Feb 22, 2022 | Never finaled issued Feb 2022, no final | 1255 Thomas Av | recommencment of work previously approved under a 202001172219 (roof replacement composite) & pa202010031220 (siding repair).Details
recommencment of work previously approved under a 202001172219 (roof replacement composite) & pa202010031220 (siding repair). | $15,000 |
| Jan 3, 2020 | Never finaled issued Jan 2020, no final | 1255 Thomas Av | repair flat concrete base fix slope deck (less than 50%) , repair t1-11 siding, replace 10 ton unit hvac.Details
repair flat concrete base fix slope deck (less than 50%) , repair t1-11 siding, replace 10 ton unit hvac. | $20,000 |
| Nov 19, 2019 | Never finaled issued Nov 2019, no final | 1342 Alabama St | reroofingDetails
reroofing | $15,000 |
| Nov 19, 2019 | Never finaled issued Nov 2019, no final | 1342 Alabama St | repair 200-300 sf ti-ii siding paint, no visible from street replace like kind.repair portion of roof.Details
repair 200-300 sf ti-ii siding paint, no visible from street replace like kind.repair portion of roof. | $3,000 |
| Aug 27, 2019 | Never finaled issued Feb 2020, no final | 2500 Fulton St | renovation of 2nd floor kingdom hall includes: main auditorium, meeting room, lobby and restroom removedel. new ada platform. new hvac. (e) elevator elvator to be refurbished under sep permit.Details
renovation of 2nd floor kingdom hall includes: main auditorium, meeting room, lobby and restroom removedel. new ada platform. new hvac. (e) elevator elvator to be refurbished under sep permit. | $405,000 |
| Oct 23, 2018 | Completed final sign-off Mar 2019 | 4360 Mission St | revision to pa 2017-0919-8943 repair to entry roof expanded to removal & constructionof roof trusses and new support beam. maintain existing roof line elevation height. no exterior changes not visible from street.remove fire alarm sprinkler stamp from plans per app#201709198943Details
revision to pa 2017-0919-8943 repair to entry roof expanded to removal & constructionof roof trusses and new support beam. maintain existing roof line elevation height. no exterior changes not visible from street.remove fire alarm sprinkler stamp from plans per app#201709198943 | $25,000 |
| Aug 31, 2018 | Completed final sign-off Mar 2019 | 4360 Mission St | revision to 201709198943 for additional repair to front wall and foundation and roof framing.framing work not visible from street. interior structural revision only.Details
revision to 201709198943 for additional repair to front wall and foundation and roof framing.framing work not visible from street. interior structural revision only. | $5,500 |
| Oct 5, 2017 | Completed final sign-off Dec 2017 | 228 Warren Dr | to obtain final inspection for work approved under pa# 201511253585. all work is complete.Details
to obtain final inspection for work approved under pa# 201511253585. all work is complete. | |
| Sep 19, 2017 | Completed final sign-off Mar 2019 | 4360 Mission St | interior remodeling to an existing church building. new exterior facade, structural upgrade, new hvac unit, new accessible restrooms, and electrical work.Details
interior remodeling to an existing church building. new exterior facade, structural upgrade, new hvac unit, new accessible restrooms, and electrical work. | $224,000 |
| Aug 30, 2016 | Completed final sign-off Mar 2017 | 2500 Fulton St | remove non-bearing wall seperating 2 library.Details
remove non-bearing wall seperating 2 library. | $2,000 |
| Nov 25, 2015 | Never finaled issued Nov 2015, no final | 228 Warren Dr | new rooms down converting garage space into habitable space includes family, bedroom, , laundry, bath, new french doors, new furnaceDetails
new rooms down converting garage space into habitable space includes family, bedroom, , laundry, bath, new french doors, new furnace | $30,000 |
| Oct 25, 2012 | Completed final sign-off Apr 2013 | 2251 26th Av | bathroom remodel - relocate shower and tub, remove adjoining closet to expand bathroom - no structural. 3 feet by 2 feetDetails
bathroom remodel - relocate shower and tub, remove adjoining closet to expand bathroom - no structural. 3 feet by 2 feet | $25,000 |
| Apr 28, 2010 | Completed final sign-off Jun 2011 | 3892 Sacramento St | unit #2. open space btn (e) kitchen and (e) living and provide beam at 3rd level. to open space btn (e) kitchen and (e) living and reinforcement to (e) garage level floor joist below area of workDetails
unit #2. open space btn (e) kitchen and (e) living and provide beam at 3rd level. to open space btn (e) kitchen and (e) living and reinforcement to (e) garage level floor joist below area of work | $4,000 |
| Apr 23, 2010 | Completed final sign-off Jun 2011 | 3892 Sacramento St | kitchen and bath upgrade in unit 2Details
kitchen and bath upgrade in unit 2 | $20,000 |
| Apr 20, 2010 | Completed final sign-off Jun 2011 | 3892 Sacramento St | unit# 6 at top floor. revision to pa# 2010.03.31.9363 create opening between kitchen and living rm, install beam.Details
unit# 6 at top floor. revision to pa# 2010.03.31.9363 create opening between kitchen and living rm, install beam. | $5,000 |
| Sep 29, 2009 | Completed final sign-off Feb 2010 | 45 Cleary Ct | kitchen remodel. replace cabinets, new appliances, new hardwood floors. min 50% of kitchen lighting wattage to be heDetails
kitchen remodel. replace cabinets, new appliances, new hardwood floors. min 50% of kitchen lighting wattage to be he | $40,000 |
| Jun 29, 2009 | Completed final sign-off Mar 2010 | 2251 26th Av | kitchen remodel, new cabinets, electrical, plumbing, install 2 pocket doors. no structural work.Details
kitchen remodel, new cabinets, electrical, plumbing, install 2 pocket doors. no structural work. | $55,000 |