Back to bathroom remodel contractors
Norcross Building Solutions
- Based in
- Elk Grove
- On San Francisco permits
- Dec 2015 to Dec 2021
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2021 | Completed final sign-off Jun 2022 | 1200 Sloat Bl | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). alteration of service equipment. | $45,000 |
| Dec 29, 2016 | Completed final sign-off Nov 2017 | 155 San Aleso Av | at ground flr - add new bathroom, office, closets and w/d within (e) envelope. at 2nd flr - renovate kitchen, 1 bathroom, add second bathroom, replace 15 windows on north side, 5 windows at rear & 1 on south. remove 1 window at rear and 3 at south. add 2 skylights.Details
at ground flr - add new bathroom, office, closets and w/d within (e) envelope. at 2nd flr - renovate kitchen, 1 bathroom, add second bathroom, replace 15 windows on north side, 5 windows at rear & 1 on south. remove 1 window at rear and 3 at south. add 2 skylights. | $96,000 |
| Dec 9, 2015 | Completed final sign-off Apr 2016 | 3845 California St | unit #1: demo kitchen & bathroom in 1st flr unit & replace all new. update elec & plumbing to code,no framing or structural work both rooms will stay the same dimensions.Details
unit #1: demo kitchen & bathroom in 1st flr unit & replace all new. update elec & plumbing to code,no framing or structural work both rooms will stay the same dimensions. | $60,000 |