Norcal Renovations

Contractor license
888904
State license record
Based in
San Juan Baustita
On San Francisco permits
May 2011 to Apr 2014
Last 24 months
0 permits filed

2 permits since 2000: 2 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllKitchen remodel 1Bathroom remodel 1

1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 126 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 22, 2014Completed
final sign-off Aug 2014
2130 45th Avbathroom remodel- plumbing alteration, 4 led bedroom, electrical alteration, mechanical, shower pan, drywall repair, door pocket, no structural change, relocate toilet, ventilation fan, occupancy sensor
Details
Permit
201404223853
Status
complete
Filed
Apr 22, 2014
Permit issued
Apr 22, 2014
Final sign-off
Aug 26, 2014
Declared cost
$10,000
Address
2130 45th Av

bathroom remodel- plumbing alteration, 4 led bedroom, electrical alteration, mechanical, shower pan, drywall repair, door pocket, no structural change, relocate toilet, ventilation fan, occupancy sensor

Open the permit page

$10,000