Noni Homes Inc
- Based in
- Sausalito
- On San Francisco permits
- Jan 2026 to Aug 2026
- Last 24 months
- 4 permits filed
4 permits since 2000: 2 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2026 | In progress issued Aug 2026 | 2673 Filbert St | remodel of (e) wood buring fireplace to (n) gas insert within the same opening. no structural changes. direct-vent, located in the living roomDetails
remodel of (e) wood buring fireplace to (n) gas insert within the same opening. no structural changes. direct-vent, located in the living room | $25,000 |
| Mar 18, 2026 | In progress issued Aug 2026 | 260 Avila St | interior renovation - relocate kitchen and bathrooms, new skylights, replace windows, new front door and garage door. no change to height or bulk.Details
interior renovation - relocate kitchen and bathrooms, new skylights, replace windows, new front door and garage door. no change to height or bulk. | $300,000 |
| Mar 16, 2026 | Completed final sign-off Jul 2026 | 155 Jefferson St | ground floor-ti includes interior modifications to create an open display space, break room, and storage area, upgrades to the (e) restroom to meet current accessiblity requirementsDetails
ground floor-ti includes interior modifications to create an open display space, break room, and storage area, upgrades to the (e) restroom to meet current accessiblity requirements | $175,000 |
| Jan 7, 2026 | Completed final sign-off Jun 2026 | 495 Los Palmos Dr | 2/f -bathroom remodel. cancel 1 shower, build closet at shower location, replace lights, fan, outlets, switches, relocate shower head at tub, replace patio door with swing door.Details
2/f -bathroom remodel. cancel 1 shower, build closet at shower location, replace lights, fan, outlets, switches, relocate shower head at tub, replace patio door with swing door. | $36,000 |