Back to bathroom remodel contractors
Nolan Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Apr 2015 to Apr 2026
- Last 24 months
- 6 permits filed
18 permits since 2000: 17 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 142 days from filing to permit and 965 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 20, 2019 | Completed final sign-off Jan 2022 | 3838 Clay St | to comply w/nov #201815151. repair to fire damage structure. work includes reconfig. of floor plates, addition of dormer at rear, excavation in basement to create (n) habitable space, (n) kitchen, baths, structural upgrades, envelope upgrades, (n) windows & doors, (n) deck less than 3' from grade.Details
to comply w/nov #201815151. repair to fire damage structure. work includes reconfig. of floor plates, addition of dormer at rear, excavation in basement to create (n) habitable space, (n) kitchen, baths, structural upgrades, envelope upgrades, (n) windows & doors, (n) deck less than 3' from grade. | $800,000 |
| Jun 26, 2017 | Expired or cancelled expired Mar 2026 | 694 Tennessee St | shell & core remodel 0f (e) ground floor & basement commercial office space; including (n) elevator & ada bathroom. voluntary seismic strengthening @ top residential floor. mep & elecator under separate permit.Details
shell & core remodel 0f (e) ground floor & basement commercial office space; including (n) elevator & ada bathroom. voluntary seismic strengthening @ top residential floor. mep & elecator under separate permit. | $200,000 |
| Sep 14, 2016 | Completed final sign-off Jan 2020 | 768 Dartmouth St | horizontal addition. two story rear addition of house, new roof deck & stairs, 1st fl is 2 bedrooms, 1 bath, 1 lavndry. 2nd fl addition is dining room. roof deck is over new bedroom @ 1st floor.Details
horizontal addition. two story rear addition of house, new roof deck & stairs, 1st fl is 2 bedrooms, 1 bath, 1 lavndry. 2nd fl addition is dining room. roof deck is over new bedroom @ 1st floor. | $150,000 |
| Mar 23, 2016 | Completed final sign-off Jul 2022 | 2062 Pine St | reconfigure units within bldg. envelope. floor 1- relocate #2064 with added habitable area. floor 2- #2062 remodel kitchen, family room & powder room. floor 3- #2062 remodel master bedroom, bath & fmaily room. rear yard landscape, site work, replace (e) retaining walls.Details
reconfigure units within bldg. envelope. floor 1- relocate #2064 with added habitable area. floor 2- #2062 remodel kitchen, family room & powder room. floor 3- #2062 remodel master bedroom, bath & fmaily room. rear yard landscape, site work, replace (e) retaining walls. | $300,000 |