Noble Construction
- Based in
- San Jose
- On San Francisco permits
- Nov 2013 to Feb 2015
- Last 24 months
- 0 permits filed
5 permits since 2000: 1 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 11, 2015 | Never finaled issued Feb 2015, no final | 2701 20th St | replace dry rotted subflooring for unit 2701 20th street.Details
replace dry rotted subflooring for unit 2701 20th street. | $1,000 |
| Nov 25, 2014 | Never finaled issued Dec 2014, no final | 1800 Alemany Bl | auto sign; double faced electric signDetails
auto sign; double faced electric sign | $3,000 |
| Nov 10, 2014 | Expired or cancelled cancelled Jan 2026 | 1800 Alemany Bl | installation of steel post in concrete base. signage will be under separate permit.Details
installation of steel post in concrete base. signage will be under separate permit. | $1,500 |
| Dec 3, 2013 | Completed final sign-off Jan 2014 | 128 Lake Merced Hill St South St | g/f - add 1 full bath at (e) store and 1 wet bar in utility room.Details
g/f - add 1 full bath at (e) store and 1 wet bar in utility room. | $3,500 |
| Nov 20, 2013 | Never finaled issued Nov 2013, no final | 128 Lake Merced Hill St South St | bathroom remodeling, remove ext tile and drywall from wwalls and floor. install new on 3rd floor. no fixtures change.Details
bathroom remodeling, remove ext tile and drywall from wwalls and floor. install new on 3rd floor. no fixtures change. | $2,200 |