Back to bathroom remodel contractors
Noah Construction Inc
- Based in
- Novato
- On San Francisco permits
- Dec 2006 to May 2016
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2016 | Completed final sign-off Oct 2016 | 149 Seal Rock Dr | remodel (e) kitchen w/ replacement of cabinets & appliances. no change in floor plan. remodel (e) bathroom w/ (n) tile & fixtures. no changes will occur in floor plan. remove (e) legal in-law kitchen permanently. in-kind remodel of bathroom, ktichen & bathroom.Details
remodel (e) kitchen w/ replacement of cabinets & appliances. no change in floor plan. remodel (e) bathroom w/ (n) tile & fixtures. no changes will occur in floor plan. remove (e) legal in-law kitchen permanently. in-kind remodel of bathroom, ktichen & bathroom. | $40,000 |
| Sep 12, 2012 | Completed final sign-off Dec 2012 | 3472 Pierce St | install 3 30" pocket doors in (e) 30" openings at bath tub room, toilet room & laundry room. install partition wall in large living room closet. dividing closet in half.Details
install 3 30" pocket doors in (e) 30" openings at bath tub room, toilet room & laundry room. install partition wall in large living room closet. dividing closet in half. | $6,400 |
| Dec 2, 2010 | Never finaled issued Dec 2010, no final | 601 Van Ness Av | remove existing fiberglass tub, tub surround, shower valve, install new tub & tile surround; install new toilet after removing existing , install tile on floor, no modifications to existing structure (one bathroom ony) no (n) lightingDetails
remove existing fiberglass tub, tub surround, shower valve, install new tub & tile surround; install new toilet after removing existing , install tile on floor, no modifications to existing structure (one bathroom ony) no (n) lighting | $8,500 |
| Dec 4, 2009 | Completed final sign-off May 2010 | 1248 Fell St | remodel existing bathroom with no structural changes. remove & replace kitchen tile floor only. (no other work).Details
remodel existing bathroom with no structural changes. remove & replace kitchen tile floor only. (no other work). | $45,000 |